My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2025-001
>
Meetings
>
2025
>
01. January
>
2025-01-07 10:00 AM - Commissioners' Agenda
>
Ordinance 2025-001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2025 12:57:21 PM
Creation date
1/13/2025 12:56:39 PM
Metadata
Fields
Template:
Meeting
Date
1/7/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve an Ordinance for the 2024 Annual Docket Amendments to the Comprehensive Plan
Order
12
Placement
Consent Agenda
Row ID
125743
Type
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
such that the crushed surfacing is completed in stages, each such stage shall be inspectedseparately. <br />G. Curb and Sidewalk Forming: <br />1' Required Notice: Two working day notice. lnspection must be complete prior to pouring <br />concrete. <br />2' lnspection Detaits: To verify proper forming and preparation for concrete in accordancewith the approved plans, and these standards. lf the scope of the project is such thatforming of curb and sidewalk is completed in stages, each such stage shall be inspectedseparately. <br />H. Curb and Sidewalk placement: <br />1. Required Notice: Two working day notice. <br />2' lnspection Details: To check placement of concrete in accordance with the approvedplans, and these standards. <br />l. Pre-Paving: <br />1. Required Notice: Two workin g day notice. <br />2' lnspection Details: Prior to paving, to verif that all work to date has been constructed inaccordance with the approved plans, and these standards. <br />. Paving: <br />1' Required Notice: Three working day notice in advance of paving with hot mix asphalt orPortland cement concrete. <br />2' lnspection Details: To verifu paving and compaction, or placement of concrete roadway isin accordance with the approved plans, and these standards. <br />K. Structural: <br />t <br />1 Required Notice: Three working day notice prior to each of critical stages such as placingfoundation piling or footings, pracement and assembry of major components, andcompletion of structure and approaches. <br />lnspection Details: Tests and certification requirements will be as directed by the countyEngineer. <br />2. <br />L.Final lnspection: <br />1. Required Notice: Five working day notice. <br />2' lnspection Details: overall check of project site, to verify completion of paving andassociated appurtenances and improvements, traffic controldevices, electrical systems, <br />Titre 12 Kittitas county code I Droft No. 5 - working Draft for Adoption 10/72/2023 <br />101
The URL can be used to link to this page
Your browser does not support the video tag.