Laserfiche WebLink
such that the crushed surfacing is completed in stages, each such stage shall be inspectedseparately. <br />G. Curb and Sidewalk Forming: <br />1' Required Notice: Two working day notice. lnspection must be complete prior to pouring <br />concrete. <br />2' lnspection Detaits: To verify proper forming and preparation for concrete in accordancewith the approved plans, and these standards. lf the scope of the project is such thatforming of curb and sidewalk is completed in stages, each such stage shall be inspectedseparately. <br />H. Curb and Sidewalk placement: <br />1. Required Notice: Two working day notice. <br />2' lnspection Details: To check placement of concrete in accordance with the approvedplans, and these standards. <br />l. Pre-Paving: <br />1. Required Notice: Two workin g day notice. <br />2' lnspection Details: Prior to paving, to verif that all work to date has been constructed inaccordance with the approved plans, and these standards. <br />. Paving: <br />1' Required Notice: Three working day notice in advance of paving with hot mix asphalt orPortland cement concrete. <br />2' lnspection Details: To verifu paving and compaction, or placement of concrete roadway isin accordance with the approved plans, and these standards. <br />K. Structural: <br />t <br />1 Required Notice: Three working day notice prior to each of critical stages such as placingfoundation piling or footings, pracement and assembry of major components, andcompletion of structure and approaches. <br />lnspection Details: Tests and certification requirements will be as directed by the countyEngineer. <br />2. <br />L.Final lnspection: <br />1. Required Notice: Five working day notice. <br />2' lnspection Details: overall check of project site, to verify completion of paving andassociated appurtenances and improvements, traffic controldevices, electrical systems, <br />Titre 12 Kittitas county code I Droft No. 5 - working Draft for Adoption 10/72/2023 <br />101