My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-10-08-minutes-solid-waste-and-maintenance
>
Meetings
>
2024
>
12. December
>
2024-12-17 10:00 AM - Commissioners' Agenda
>
2024-10-08-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 12:06:57 PM
Creation date
12/12/2024 12:03:39 PM
Metadata
Fields
Template:
Meeting
Date
12/17/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
125170
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />Attn: Patti Stacey <br />Patti.staceV@co.kittitas.wa.us <br />JA4M, <br />ii, `= <br />A -CENTRAL <br />- ASBESTOS ABATEMENT QUOTE - <br />COURTHOUSE TREASURERS & ASSESSORS OFFICES <br />205 E STH AVE, ELLENSBURG, WA <br />September 18, 2024 <br />We appreciate the opportunity to provide pricing for the project referenced above. The quoted services as outlined <br />herein are based on information furnished in the bid drawings, specs, and/or as provided by you: <br />SCOPE OF SERVICES <br />Provide the following in the Treasurer's Office and Assessor's Office: <br />Remove & reinstall a single window pane/glazing above the exterior door in the Treasurer's Office to be utilized as <br />a negative air unit exhaust point <br />Remove & dispose of acoustical insulation finish material at each of the damaged/delaminating locations <br />surrounding ceiling HVAC registers in the Treasurer's Office & Assessor's Office. <br />Apply a bridging encapsulant to the remaining ceiling materials at the removal locations to seal the exposed <br />plaster ceiling and edges of ACM acoustical insulation. <br />*Scope includes the following perState, Federal, and Local Regulations; Thorough pre -clean of the subject work areas, <br />setup of a Negative Pressure Enclosure (NPE) with proper decontamination & load out chambers in all work areas, setup <br />of HEPA filtered negative air machines to facilitate a minimum of (4) air exchanges per hour in each containment <br />protection/covering of building surfaces to remain in the work areas with (2) layers of independently sealed 6-mil poly <br />sheeting, and intact removal of all ACM's. <br />INCLUSIONS: <br />Certified labor, prevailing wages, intent/affidavit, submittals, equipment, materials, insurance, regulatory asbestos <br />permits, environmental & personnel air monitoring and PCM analysis, mobilization, and fees necessary to complete the <br />project as specified, except as noted in "Assumptions & Exclusions". <br />ASSUMPTIONS & EXCLUSIONS: <br />1. Assumes power & water sources will be available for use at the project site, provided by the client. <br />2. Assumes contents or items in the work area(s) will be removed by others prior to arrival, if applicable. <br />3. Assumes the owner will hire a third -party Consultant/IH to perform pre & post abatement air sampling. <br />4. Excludes conducting any work outside of normal operating hours. <br />5. Excludes the removal or handling of any materials or items not referenced herein. <br />COST ESTIMATE: <br />$17,626 + WA State Sales Tax (if applicable) <br />Sincerely, <br />Justin Wood, Owner/Estimator <br />lust)n@A-Centra I.com <br />3019 GS Center Road / PO Box 1764, Wenatchee, WA 98807 • Phone: (509) 888-5542 • Fax: (509) 888-6543 • 111foAA-Central.com <br />WA State Contractors Registration #ASBESCL804PL • L&I Asbestos Certification #1718 • www.acentralwa,com <br />
The URL can be used to link to this page
Your browser does not support the video tag.