Laserfiche WebLink
State of Washington Department of Ecology <br />Agreement No: WRYBIP-2325-KiCPWD-00058 <br />Project Title: Lower Kittitas Reach Design and Agency Coordination <br />Recipient Name: Kittitas County <br />SCOPE OF WORK <br />Task Number <br />Task Cost: $395,000.00 <br />Task Title: Lower Kittitas Reach Draft Design and Permitting <br />Page 8 of 22 <br />Task Description: <br />Kittitas County has recently worked with project partners to evaluate restoration alternatives and develop conceptual design <br />drawings for designs for a 595-acre floodplain restoration project associated with the removal on the Hansen Flood Control <br />Levee and partial restoration of the Hansen Gravel Pits. Restoration will promote complex and dynamic fluvial processes by <br />removing bank revetments, reconnecting and creating side -channel habitats, connecting floodplains, addressing gravel pit <br />degradation, and re-establishing a cottonwood gallery forest. Kittitas County will advance the Lower Kittitas Reach Floodplain <br />Reconnection Project Restoration preferred alternative to the draft/permit-ready (80%) design phase, to include design sheets, <br />a basis of design report, and design level cost estimates. These designs will meet the qualifications for construction permit <br />applications with local, state, and federal agencies. The following permit applications will be prepared: Joint Aquatic Resources <br />Permit Application, Hydraulic Permit Application, and local permit applications. <br />Task Goal Statement: <br />Completing draft/permit-ready designs will enable the current restoration effort to proceed to the next design phase and will <br />support project implementation grant applications. <br />Task Expected Outcome: <br />Obtain draft/permit-ready (80%) design documents and permit applications for the proposed project <br />Recipient Task Coordinator: Arden Thomas <br />Lower Kittitas Reach Draft Design and Permitting <br />Deliverables <br />Number <br />Description <br />Due Date <br />2.1 <br />Copy of RCO Match Contract <br />12/31/2024 <br />2.2 <br />Deliverable: Draft Design Sheets and Basis of Design Report <br />12/31/2026 <br />2.3 <br />Deliverable: Permit Applications (DARPA, HPA, Local Permits) <br />12/31/2026 <br />Template Version 12/10/2020 <br />