My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-10-28-minutes-public-works-and-cds-study-session
>
Meetings
>
2024
>
11. November
>
2024-11-19 10:00 AM - Commissioners' Agenda
>
2024-10-28-minutes-public-works-and-cds-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 1:04:02 PM
Creation date
11/14/2024 1:00:08 PM
Metadata
Fields
Template:
Meeting
Date
11/19/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
124307
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Community Events <br />Attend 2-3 community events at various points in the project to engage with community members <br />and gather information. This could be paired with Climate Element events and we could look for <br />times to combine efforts with other engagement to stretch project budget. <br />Easton Sub -area <br />Attendance at up to three community meetings focused on development of sub -area plan policies <br />to be included within the comprehensive plan. Additional engagement may be gained by having a <br />community event or open house in Easton. <br />Public Open Houses <br />The consultant team recommends allowing for three open house -type public meetings at the <br />project midpoint to share and discuss Comprehensive Plan concepts and draft elements. The open <br />houses could be organized in one of two ways: <br />Same content repeated at open houses held in geographically distinct areas of the County <br />to improve accessibility to the planning process. <br />Open houses with different topics held and held in a relatively central location. <br />Open Houses may be coordinated with open houses anticipated for Climate Element. <br />Project team will lead the scheduling, agenda, and content development of each open house <br />meeting. County will assist with booking facilities. <br />Task4: Best Available Science (BAS) review and gap analysis <br />Given the Kittitas County Critical Area Ordinance (CAO) has recently been updated, task will <br />include analysis of existing Critical Areas Code to review Best Available Science and identify any <br />additional CAO updates which may be required. <br />Detiverables: <br />Short memo outlining any CAO updates which may need to be included as part of the <br />Periodic Update. if no updates are required, memo will be included as part of the record. <br />Assumptions: <br />• Code changes identified will be addressed as part of Task 15. <br />Task 5: Plan audit and Commerce checklist <br />Task wilt include completing the Periodic Update Checklist for Fulty-Planning Counties. This will be <br />the basis for understanding policy and code changes that will need to be addressed as part of the <br />update process. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.