My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
lowervalleyTS_request for CA No. 3 _final
>
Meetings
>
2024
>
11. November
>
2024-11-05 10:00 AM - Commissioners' Agenda
>
lowervalleyTS_request for CA No. 3 _final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 12:04:40 PM
Creation date
10/31/2024 12:04:37 PM
Metadata
Fields
Template:
Meeting
Date
11/5/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Chair Signature on an Amendment to SCS Engineers Contract for the Lower Valley Transfer Station.
Order
3
Placement
Consent Agenda
Row ID
123866
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kittitas County Lower Valley Transfer Station <br />September 30, 2024 <br />Page 4 <br /> <br />Table 1. Proposed Fees for Amendment 3 <br />CLOSING <br />SCS appreciates the opportunity to assist you on this important project. We will continue to work <br />closely with you and your staff to ensure that responsive and efficient services are provided. We look <br />forward to working with you further on this project. Please do not hesitate to contact us if you have <br />any questions or comments. <br />Sincerely, <br /> <br /> <br /> <br /> <br /> <br />Thomas D. Parker, P.E., BCEE Michelle P. Leonard <br />Project Director Senior Vice President <br />SCS Engineers SCS Engineers <br /> <br />Task Task Description Estimated Cost Billing Type <br />1.1 Project Management $24,164 Time and Materials <br />1.2 Submittal Review/RFI Response/ <br />Design Changes Notices $211,896 <br />Time and Materials <br />1.3 Project Meetings and Specialty <br />Inspections $43,955 <br />Time and Materials <br />1.4 Geotechnical Engineering Support $12,800 Time and Materials <br />1.5 Project Closeout and As-Builts $69,045 Time and Materials <br />2.1 Compost Pond Re-Design $18,200 Lump Sum <br />2.2 Additional Support During the <br />Bidding Phase $39,910 Lump Sum <br />2.3 Owner Requested Services $18,500 Time and Materials <br /> Total $438,470
The URL can be used to link to this page
Your browser does not support the video tag.