Laserfiche WebLink
all minor and design plan changes of the roadway and drainage systems-a he <br /> Department of Public Works shall specifythe number of mYhW8 e <br /> rranted <br /> by the type of improvement. <br /> ff original plans were completed on a CADD sYstea copy of <br /> developer/contractor shaft submit,in addition to nv%-Att lirj.l&la-- <br /> the CADD drowingfiles in.DWG format- <br /> M. Final Maintenance inspection: <br /> 1. Required Notice:30 days prior to the end of the maintenance period. <br /> 2. Inspection Details: Overall check of work associated with a maintenance <br /> guarantee. <br /> 3. Additional Requirements:Prior to release of the maintenance guarantee,there <br /> shall be successful completion of the maintenance period as described KCC <br /> 12.01.090,repair of any failed facilities and the payment of any outstanding fees. <br />