surfacing Is installed in stages,multiple Inspections shad be scheduled as <br /> necessaryto ensure that all subgrade has been inspected. <br /> F. Crushed Surfacing Placement: <br /> 1. Required Notice:Two working day notice. <br /> 2. inspection Details:To verify that crushed surfacing has <br /> beenlaccestanda and If the <br /> compacted in accordance with the approved plans, <br /> scope of the project is such that the crushed surfacing is completed in stages, <br /> each such stage shall be inspected separately. <br /> G. Curb and Sidewalk Forming: <br /> 1. Required Notice:Two working day notice.Inspection must be complete prior to <br /> pouring concrete. rg re <br /> 2. Inspection with t e verify properns,an'ng and d thesepstandards.if the scope of the <br /> accords nee with the approved p <br /> project is such that forming of curb and sidewalk is completed in stages,each <br /> such stage shall be inspected separately. <br /> H. Curb and Sidewalk Placement: <br /> 1. Required Notice:Two working day notice. <br /> 2. Inspection Details:To check placement of concrete in accordance with the <br /> approved plans,and these standards. <br /> 1. pre-Paving: <br /> 1. Required Notice:Two working day notice. <br /> 2. inspection Details: Prior to paving,to verify that OU rk to date has been <br /> constructed in ccordan a with the approved plans, d these standards. <br /> J. Paving- <br /> 1. Required Notice:Three working day notice in advance of paving with hot mix <br /> asphalt or Portland cement concrete. <br /> 2. Inspection Details:To verify paving and compaction,nd theseentOf ndards concrete <br /> roadway is in accordance with the approved plans, <br /> K. StructuraL- <br /> 1. Required Notice:Three working day notice prior to each of critical stages such as <br /> placing foundation piling or footings,placement and assembly of major <br /> components,and completion of structure and aproaches. <br /> 2. Inspection Details:Tests and certification requirements will be as directed by the <br /> County Engineer. <br /> L. Final Inspection: <br /> 1. Required Notice: Five working day notice. <br /> 2. inspection Details: Overall checkof project site,to verity completion of paving <br /> and associated appurtenances and improvements,traffic control <br /> edges, <br /> electrical systems,utility installation,cleaningof drainage system, <br /> restoration,seeding,planting,and all necessary clean-up in accordance with the <br /> approved plans and these standards. <br /> 3. Additional Requirements: Prior to final approval of construction work, <br /> acceptance for maintenance and release of construction performance bonds,the <br /> developer/contractor shall pay any required fees,submit any required <br /> maintenance and defect financial guarantees,provide certification of <br /> ' monumentation and submit one set of corrected plans(as-built)reflecting <br />