Laserfiche WebLink
all minor and design plan changes of the roadway and drainage systems.The <br /> Department of Public Works shall specify then umber of, iy iersets as warranted <br /> by the type of improvement. <br /> addftqe If original plans were completed on a CADD system,the <br /> developer/contractor shall submit,in addition to mglarsphysical plans,a copy of <br /> the CADD drawing files in.DWG format. <br /> M. Final Maintenance Inspection: <br /> 1. Required Notice:30 days prior to the end of the maintenance period. <br /> 2. Inspection Details: Overall check of work associated with a maintenance <br /> guarantee. <br /> 3. Additional Requirements:Prior to release of the maintenance guarantee,there <br /> shall be successful completion of the maintenance period as described KCC <br /> 12.01.090.repair of any failed facilities and the payment of any outstanding fees. <br />