My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-22-2024 CDS_Special SS Briefings
>
Meetings
>
2024
>
10. October
>
2024-10-22 8:00 AM - CDS Study Session
>
10-22-2024 CDS_Special SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2024 11:25:36 AM
Creation date
10/17/2024 10:44:10 AM
Metadata
Fields
Template:
Meeting
Date
10/22/2024
Meeting title
CDS Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Special
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
all minor and design plan changes of the roadway and drainage systems.The <br /> Department of Public Works shall specify then umber of, iy iersets as warranted <br /> by the type of improvement. <br /> addftqe If original plans were completed on a CADD system,the <br /> developer/contractor shall submit,in addition to mglarsphysical plans,a copy of <br /> the CADD drawing files in.DWG format. <br /> M. Final Maintenance Inspection: <br /> 1. Required Notice:30 days prior to the end of the maintenance period. <br /> 2. Inspection Details: Overall check of work associated with a maintenance <br /> guarantee. <br /> 3. Additional Requirements:Prior to release of the maintenance guarantee,there <br /> shall be successful completion of the maintenance period as described KCC <br /> 12.01.090.repair of any failed facilities and the payment of any outstanding fees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.