My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-22-2024 CDS_Special SS Briefings
>
Meetings
>
2024
>
10. October
>
2024-10-22 8:00 AM - CDS Study Session
>
10-22-2024 CDS_Special SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2024 11:25:36 AM
Creation date
10/17/2024 10:44:10 AM
Metadata
Fields
Template:
Meeting
Date
10/22/2024
Meeting title
CDS Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Special
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
surfacing is installed in stages,multiple inspections shall be scheduled as <br /> necessary to ensure that all subgrade has been inspected. <br /> F. Crushed Surfacing Placement: <br /> 1. Required Notice:Two working day notice. <br /> 2. Inspection Details:To verify that crushed surfacing has been placed and <br /> compacted in accordance with the approved plans,and these standards.If the <br /> scope of the project is such that the crushed surfacing is completed in stages, <br /> each such stage shall be inspected separately. <br /> G. Curb and Sidewalk Forming: <br /> 1. Required Notice: Two working day notice.Inspection must be complete prior to <br /> pouring concrete. <br /> 2. Inspection Details:To verify proper forming and preparation for concrete in <br /> accordance with the approved plans,and these standards.If the scope of the <br /> project is such that forming of curb and sidewalk is completed in stages,each <br /> such stage shall be inspected separately. <br /> H. Curb and Sidewalk Placement: <br /> 1. Required Notice:Two working day notice. <br /> 2. Inspection Details:To check placement of concrete in accordance with the <br /> approved plans,and these standards. <br /> I. Pre-Paving: <br /> 1. Required Notice:Two working day notice. <br /> 2. Inspection Details: Prior to paving,to verify that all work to date has been <br /> constructed in accordance with the approved plans,and these standards. <br /> J. Paving: <br /> 1. Required Notice:Three working day notice in advance of paving with hot mix <br /> asphalt or Portland cement concrete. <br /> 2. Inspection Details: To verify paving and compaction,or placement of concrete <br /> roadway is in accordance with the approved plans,and these standards. <br /> K. Structural: <br /> 1. Required Notice:Three working day notice prior to each of critical stages such as <br /> placing foundation piling or footings,placement and assembly of major <br /> components,and completion of structure and approaches. <br /> 2. Inspection Details: Tests and certification requirements will be as directed by the <br /> County Engineer. <br /> L. Final inspection: <br /> i. Required Notice: Five working day notice. <br /> 2. Inspection Details: Overall check of project site,to verify completion of paving <br /> and associated appurtenances and improvements,traffic control devices, <br /> electrical systems,utility installation,cleaning of drainage system,edge <br /> restoration,seeding,planting,and all necessary clean-up in accordance with the <br /> approved plans and these standards. <br /> 3. Additional Requirements: Prior to final approval of construction work, <br /> acceptance for maintenance and release of construction performance bonds,the <br /> developer/contractor shall pay any required fees,submit any required <br /> maintenance and defect financialgus rantees,provide certification of <br /> monumentation and submit one.riyta=set of corrected plans(as-built)reflecting <br />
The URL can be used to link to this page
Your browser does not support the video tag.