My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$ 5.3 Acceptance of Bid (Award) <br />$ 5.3.t It is the intent of the Owner to award a Conkact to the lowest resporsive and responsible Bidder, provided the <br />Bid has been submitted in accordance with the requirements of the Bidding Documents. Unless othenvise prohibited by <br />law, the Owner shall have the right to waive informalities and irregularities in a Bid received and to accept the Bid <br />which, in the Owner's judgmenl is in the Owner's best interests. <br />$ 5.3.2 Unless otherwise prohibited by law, the Owner shall have the right to accept Aitemates in any order or <br />iombination, unless otherwise specifically provided in the Bidding Documents, and to determine the lowest responsive <br />and responsible Bidder on the basis of the sum of the Base Bid and Alternates accepted. <br />ARTICLE 6 POST.BID INFORMATION <br />g 6.1 Contractois Qualificalion Statement <br />Bidders to whom award of a Contract is under consideration shall submit !o the Architect, lpon request and within the <br />timeframe specified by the Architect, a properly executed AIA Document A305rM, Contractor's Qualification <br />Statement, unless such a Statement has been previously required and submitted for this Bid. <br />$ 6.2 Owne/s Financial Capabilily <br />A Bidcler to whom award of a Contract is under consideration may request in writing, fourteen days prior to the <br />expiration of the tim e for withdrawal of Bids, that the Owner fumish to the Bidder reasonable evidence that financial <br />arrangements have beenmade to fulfill the Owner's obligations under the Contact. The Owner shall then ftrnish such <br />reasonable evidence to the Bidder no later tlnn seven days prior to the expiration of the time for withdrawal of Bids. <br />Unless zuch reasonable evidence is fumished within the allotted time, the Biclder will not be required to execute the <br />Agreement between the Owner and Contractor. <br />$ 6.3 Submittals <br />$ S.S.t after notihcation of selection lor the award of the Contact, the Bidder shall, as soon as practicable or as <br />stipulated in the Bidding Documents, submit in writing to the Owner th,rough the Archibct: <br />.1 a designation of the Work to be performed with the Bidder's own forces; <br />.2 names of the principal products and systems proposed for the Work and the manufacturers and suppliers <br />ofeach; and <br />.3 names of persons or entities (including those who are to fumish materials or equipment fabricated to a <br />special design) proposed for the principal portions of the Work. <br />g 6.3.2 The Bidder will be required to establish to the satisfaction of the Architect and Owner the reliability and <br />iesponsibility of the persons or entities proposed to fumish and perform the Work described in the Bidding Documents. <br />$ 6.3.3 Prior to the execution of the Contrac! the Architect will notiff the Bidder if either the Owner or Architect after <br />due investigation, has reasonable objection to a person or entity proposed by the Bidder. Ifthe Owner or Architect has <br />reasonable objection to a proposed person or entity, the Bidder may, at the Bidder's option, withdraw the Bid or submit <br />an acceptable substitute person or entity. The Bidder may also submit any required adjustment in the Base Bid or <br />A.ltemate Bid !o account for the difference in cost occasioned by such substitution. The Owner may accept the adjusted <br />bid price or clisqualify the Bidder. In the event of either withdrawal or disqualihcatioq bid security will not be forfeited. <br />$ 5.3.4 Persons and entities proposed by the Bidder and to whom the Owner and Architect have made no reasonable <br />objection must be used on the Work for which they were proposed and shall not be changed except with the written <br />consent of the Owner and Architect. <br />ARTICLE 7 PERFORJilANCE BOND ANO PAYMENT BOND <br />g 7.1 Bond Requirements <br />$ Z.t.t ff strpulated in the Bidding Documents, the Bidder shall fumish bonds covering the faithful performance of the <br />Contract and payn:ent of all obligations arising thereunder. <br />$ 7.1.2 If the fumishing of suchbonds is stipulated in the Bidding Documents, the cost shall be included in the Bid. If <br />the fumishing of such 6onds is required at'ter receipt of bids and before execution of the Contract, the cost of such bonds <br />shall be added to the Bid in determining the Contact Sum. <br />$ 7.1.3 The Bidder shall provide swety bonds from a company or companies lawfully authorized to issue surety bonds <br />in the jwisdiction where the Project is located. <br />AtA Docunent Al01 - <br />"tuerican Institute 2018. Copyrighl <br />of Architects," <br />@ 1"910, l9'14, L91a, 798'1, 1991 and 2018. A11 righte <br />"AIA," the AIA Logo. and 'AIA Contract Docudent3" are <br />reserved. 'The Anerican In5titute of AEchitects." <br />AEchitects. thig dEaft was produced at 09:50:34 Pr on o5l!3/?o24 under oEder No.4704243041 <br />tEadenarks of The Anerican Institute of <br />uhich expiEes on O6/Lo/2o24, i3 not for Eesale, O <br />iE licensed ior one-t.ine uge nay onty be used in accordance uilh the AIA contEact Docunent5o ?erns of Service. To rePort <br />copycighL vioLations, e-nail <br />t945244259\Urat lot€r: <br />Kittitas County - Lower Valley <br />Transfer Station <br />I nstructions to Bidders <br />(AlA Document A701) <br />June 18, 2024 <br />onlyr and <br />docinfo0s iacontracts.com <br />6 of 8
The URL can be used to link to this page
Your browser does not support the video tag.