My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$ 3.1.2 Any required cleposit shall be refunded to Bidders who submit a bona fide Bid and retum the paper Bidding <br />Documents in good condition within ten days after receipt of Bids. The cost to replace missing or damaged paper <br />documents will be deducted tiom the deposit. A Bidder receiving a Contract award may retain the paper Bidding <br />Documents, and the Bidder's deposit will be refunded. <br />$ 3.1.3 Bidding Documents will not be issued directly to Sub-bidders uniess specifically offered in the advertisement or <br />invitation to bid, or in suppiementary instructions to bidders. <br />$ 3.1.4 Bidders shall use complete Bidding Documents in preparing Bids. Neither the Owner nor Architect assumes <br />responsibility for enors or misinterpretations resulting from the use of incomplete Bidding Documents. <br />$ 3.1.5 The Biddrng Documents will be available for the sole purpose of obtaining Bids on the Work. No license or grant <br />of use is cont'erred by distribution of the Bidding Documents. <br />g 3.2 Modification or lnterpretalion of Bidding Documents <br />$ f.Z.t fn. Biclder shall carefully sh:dy the Bidding Documents, shall e><amine the site and local conditions, and shall <br />notify the Architect of errors, inionsisiencies, or ambiguities discovered and request clarification or interpretation <br />pursuant to Section 3.2.2. <br />$ 3.2.2 Requests for clarification or interpretation of the Bidding Documents shall be submitred by the Bidder in writing <br />and shall be received by the Architect at least seven days prior to the date for receipt of Bids. <br />gndieete hen+su€h es 4' entai| $'ebsitq llr,st sib,ble{ern++qer eeprt er edgr ntetlzedBiCders dwll subfiit t efltaests <br />@ <br />$ 3.2.3 Modifications and interpretations of the Bidding Documents shall be made by Addendum. Modific_ations and <br />interpretations of the Bidding Documents made in any other manner shall not be binding, and Bidders shall not rely <br />upon them. <br />$ 3.3 Substitutions <br />I S.S.t fl. materials, products, and equipment described in the Bidding Documents establish a standard of required <br />function, dimension, appearance, and quality to be met by any proposed substitution. <br />$ 3.3.2 Substitution Process <br />$ S.f.Z.t Written requests for substitutions shall be receivecl by the Architect at least ten days prior to the date for receipt <br />of gid". Requests shatt Ue submitted in the same manner as that established for zubmifiing clarifications and <br />interpretations in Section 3.2.2. <br />$ 3.3.2.2 Biclders shall submit substitution requests on a Substitution Request Form if one is provided in the Biddrrg <br />Documents. <br />$ 3.3.2.3 If a Substitution Request Form is not provided, requests shall include (1) the name of the material or <br />iquipment specified rn the Bidding Documenls; (2) the reason for the requested zubstitution; (3) a complete description <br />of the propoied substitution including the name of the material or equipment proposed as the substitute, performance <br />and teit data, and relevant drawings; and (4) any other information necessary for an evaluation. The request shall <br />include a statem ent setting forth ch"ng"r in other maierials, equipm en! or other portions of the Work, incl_Yding <br />changes in the work of other conkacts or the impact on any Project Certifications (such as LEED), that will result from <br />incorporation of the proposed substitution. <br />$ 3.3.3Theburdenofproolofthemeritoftheproposedsubstitutionisupontheproposer.TheArchitect'sdecisionof <br />approval or disapproval of a proposed substitution shall be final. <br />$ 3.3.4 If the Architect approves a proposed substitution prior to receipt of Bids, zuch approval shall be set forth in an <br />Addendum. Approvals made in any other manner shall not be binding, and Bidders shall not rely upon them. <br />$ 3.3.5 No substitutions will be considered after the Contract award unless specificaliy provided for in the Contact <br />Documents. <br />AIA Docunent A?01 - 20 <br />"Aoericao Institute of <br />18. cof,yright <br />Architects, " <br />@ 7910, 1914, L918, 198'1, 199? and 2t118. AII rights <br />'ArA,' the AtA Logo, and "ALe- contract Docu[ent3" are <br />reserved. "The Merican InstiLute of Archi.tects," <br />tradenarks of The AheEican Institute of <br />AEchitects- Thig draft uas produced at 09:50:34 PT on 05/13/2024 undeE Order No.410424304?uhich expires on 06/10/2024' is not for resale,3 <br />is licensed ior one-tire use <br />copyright violations, e-Bail <br />in accordance uith the AIA Contract Docunentst Tetns of servlce. To report <br />gror lotea:1945244259) <br />Kittitas County - Lower ValleY <br />Transfer Station <br />lnstructions to Bidders <br />(AlA Document 4701) <br />June 18, 2024 <br />only, and hay only be used <br />docin fo0aiacont rac ts . con . <br />3of8
The URL can be used to link to this page
Your browser does not support the video tag.