Laserfiche WebLink
ARTICLE 1 DEFINITIONS <br />$ 1.1 Bidding Documents include the Bidding Requirements and the Proposed Conlract Documenls. The Bidding <br />i.equirementi consist of the advertisement oiinvitation to bid, Instructions to Bidders, supplementary instructions to <br />bidtlers, the bid fornr, and any other bidding fonns. The Proposed Contract Documents consist of the unexecuted form <br />of Agreement between the Owner ancl Conhactor and that Agreement's Exhibi*, Conditions of the Contract (General, <br />Supp-lementary and other Conditions), Drawings, Specifications, all Addenda, and all other documents enumerated in <br />Article 8 of these Instructions. <br />$ 1.2 Definitions set forth in the General Conditions of the C.ontract for Construction, or in other Proposed Contract <br />Documents apply to the Bidding Documents. <br />$ 1.3 Addenda are wntten or graphic instruments issued by the Architect, which, by additions, deletions, clariflications, <br />or corrections. rnodi$ or interpret the Bidding Documents. <br />S 1.4 A Bid is a complete and properly executed proposal to do the Work for the sr.uns stipulaled therein, submitted in <br />accordance with the Bidding Documents. <br />$ 1.5 The Base Bid is the sum stated in the Bid for which the Bidder offers to perfonn the Work described in the <br />Bidding Do..tments, to which Work may be added or deleted by swns stated in Altemate Bids. <br />$ 1.6 An Altemate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from, or that does not <br />ih.ng., the Base gid if ihe corresponding change in the Work, as described in the Bidding Documents, is accepted. <br />S 1.7 A UnitPrice is an anrount stated inthe Bid as a price per unit of rneasurement for materials, equipment, or <br />services, or a portion of the Worlg as described in the Bidding Documents <br />$ 1.8 A Bidcler is a person or entity who submits a Bid and who meets the requirements set forth in the Bidding <br />Documents. <br />$ 1.9 A Sub-bidder is a person or entity who submits a bid to a Bidder for materials, equipment, or labor for a portion of <br />the Work. <br />ARTICLE 2 BIDDERS REPRESENTATIONS <br />$ 2.1 By zubmitting a Bid, the Bidder represents that: <br />.1 the Bidder has read and understands the Bidding Documents; <br />.2 the Bidder wrderstands how the Bidding Documents relate to other portions of the Project if any, being <br />bid concurrently or presently under construction; <br />.3 the Bid complies with the Bidding Documents; <br />.4 the Bidder has visited the site, become familiar with local conditions under which the Work is to be <br />performed, and has correlatecl the Bidder's observations with the requirements of the Proposed Contract <br />Documents; <br />.5 the Bid is based upon the materials, equipmen! and systems required by the Bidding Documents without <br />exception; and <br />.6 the Iiiclder has read and understands the provisions for liquidated damages, if any, set lorth in the form of <br />Agreement between the Owner and Contractor. <br />ARTICLE 3 BIDDING DOCUMENTS <br />$ 3.1 Distribution <br />$ 3.1.1 Bidders shall obtain complete Bidding Documents, es-indi€otec+€l€+{'; from <br />advertisement or invitation to bid" for the deposit sum, if any, state d therein. <br />the issuing office designated in the <br />Deffien*) <br />Artr Docunent Al01 - 2018. copyright o 19?0' 19?4, <br />"tuerican Institute of Architects," "ArA." the AIA <br />AEchitects. fhis dtaft uas produced at 09:50i34 FT <br />is licensed for one'tine use only, and nay only be <br />copycight viol.ations, e-naiI docinfooaiecontracte'con <br />U.ar tfot.c: <br />LglAt 1987,199? and 2016. AlI rights reseEved. "The Metican Inslitute of Architects," <br />trogo, and "AIA Contract DocuDent3" are trademorks of The herican Institute of <br />on oslL3/2o24 under older No-4LD4243041 wbich expires on D6/L0/2O24, i3 not for resaLe, <br />used in accordance vrith the AIA contract Docunents' Terms of Service' To report <br />2 <br />19452442s91 <br />Kittitas County - Lower ValleY <br />Transfer Station <br />lnstructions to Bidders <br />(AlA Document A701) <br />June L8,2024 <br />2of8