Laserfiche WebLink
KITTITAS COUNTY - LOWER VALTEY TRANSFER STATION <br />ADDENDUM NO.4 <br />tuLY 29,2024 <br />The above-referenced Contract Documents shall be amended as indicated in detail below' One signed <br />copyoftheCertificationpageshall beincludedwiththebid. TheinclusionofthisAddendumwillbe <br />noted in the Agreement, and the execution of the Contract shall indicate full acceptance by all parties of <br />the provisions contained herein. All other provisions of the Plans, Specifications, and other Contract <br />Documents not noted in the Addendum shall remain unchanged and in full effect. This Addendum shall <br />be attached to and become a part of the Plans and Specifications for the project. <br />Addendum <br />Item <br />Document Section, <br />Page <br />Number, or <br />Sheet <br />Description of Change <br />4.0!Response to <br />RFI Questions <br />List <br />Response to RFI Questions List is hereby added and <br />included in the contract documents. <br />4.O2 Bid Due Date Change Bid Due Date to August 2,2024 at L0:00 AM <br />Pacific Time Zone on the <br />INVITATION TO BID document. <br />Revised excel spreadsheet provided to contractors. <br />4.03 Revised Bid <br />Schedule <br />Attached is the revised Bid Schedule. Contractor must use <br />Addendum No 4 Bid Schedule with its bid. <br />Four(4) Bid quantities revised <br />Bid ltem 5 - Clear and Grub - increased bid quantity to 30 <br />acres. <br />Bid ltem 8 - Geotextiles- lncreased Bid Qty to 55,400 SY <br />Bid ltem No. 17 - Site Fencing - 6' High Chainlink- <br />increased bid quantity to 3,975 LF. <br />Bid ltem No. 18 - Site Fencing - Gates- reduced bid <br />quantity to: 8 ea. <br />Gates shall be installed at the following locations <br />Four (4)- 10' Wide Gates at main entrance. <br />Two (2) - 10' Wide Gates along Hwy 97 at temporary <br />construction entrance <br />Two 2 - 12'Wide ga tes at Northwest corner of site. <br />Page 1 of 3