Laserfiche WebLink
underground cables are pulled inside <br />UPVC conduits. <br />E6O2 - Add the following note: <br />The main cable from the UtilitY <br />equipment to the customer disconnect <br />switch, then to the ATS and to the main <br />switch board shall be (2a) 600 MCM AL <br />conductor pulled inside (6)4" conduits. <br />3.05 Door Operator <br />Substitution <br />The door operator substitution (Horton <br />Series 7000) is approved. <br />3.06 EV Charger <br />Specifications <br />Add the following to the technical <br />specifications: <br />The EV chargers shall operate on the <br />normal power source only not on <br />backup power. Level(2)7.2 KW EV <br />chargers shall be fed through l-phase <br />10 KVA step down transformer next to <br />each pedestal (Grouping under one <br />transformer is allowed). <br />EV Chargers shall be Leviton Model <br />EC32W with EPED1 Single Mount <br />Charging Station Pedestal or approved <br />equal. <br />Total of 4 EV charging stations: 3 at the <br />Administration Building and 1 at the <br />Scalehouse. <br />END OF ADDENDUM NO. 3 <br />Page 2 of 3