My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
underground cables are pulled inside <br />UPVC conduits. <br />E6O2 - Add the following note: <br />The main cable from the UtilitY <br />equipment to the customer disconnect <br />switch, then to the ATS and to the main <br />switch board shall be (2a) 600 MCM AL <br />conductor pulled inside (6)4" conduits. <br />3.05 Door Operator <br />Substitution <br />The door operator substitution (Horton <br />Series 7000) is approved. <br />3.06 EV Charger <br />Specifications <br />Add the following to the technical <br />specifications: <br />The EV chargers shall operate on the <br />normal power source only not on <br />backup power. Level(2)7.2 KW EV <br />chargers shall be fed through l-phase <br />10 KVA step down transformer next to <br />each pedestal (Grouping under one <br />transformer is allowed). <br />EV Chargers shall be Leviton Model <br />EC32W with EPED1 Single Mount <br />Charging Station Pedestal or approved <br />equal. <br />Total of 4 EV charging stations: 3 at the <br />Administration Building and 1 at the <br />Scalehouse. <br />END OF ADDENDUM NO. 3 <br />Page 2 of 3
The URL can be used to link to this page
Your browser does not support the video tag.