My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY - TOWER VALLEY TRANSFER STATION <br />ADDENDUM NO.3 <br />tuLY 24,2024 <br />The above-referenced Contract Documents shall be amended as indicated in detail below. One signed <br />copy of the Certification page shall be included with the bid. The inclusion of this Addendum will be <br />noted in the Agreement, and the execution of the Contract shall indicate full acceptance by all parties of <br />the provisions contained herein. All other provisions of the Plans, Specifications, and other Contract <br />Documents not noted in the Addendum shall remain unchanged and in full effect. This Addendum shall <br />be attached to and become a part of the Plans and Specifications for the project. <br />Addendum <br />Item <br />Document Section, Page <br />Number, or Sheet <br />Description of Change <br />3.01,Response to RFI <br />Questions List <br />Response to RFI Questions List is <br />hereby added and included in the <br />contract documents. <br />3.02 Door Operator <br />Substitution <br />The door operator substitution (Horton <br />Series 7000) is approved. <br />3.03 Architectural Drawings A1_4601, <br />A2_A801, <br />A3_A801, <br />A2_A101, <br />A2_A801, <br />A3 4101 <br />Make the following changes below: <br />Sheets A1_A601, A2-A801, A3-A801: <br />WOM-1 and WM-]. are both Walk Off <br />Mats. <br />Sheet A2-A101: Provide Walk Off Mat <br />per Flag Note 8 in Lobby. <br />Sheet A2-A801: Room Finish Schedule: <br />Delete RF-1 at Lobby floor <br />Sheet A3-A101: Provide Walk Off Mat <br />per Flag Note 9. Floor Plan Room 3-01 <br />3.04 Electrical Drawings Er.00, <br />E602 <br />E1"00 -Remove EV Chargers at the <br />Compost Area. <br />E100 - Add the following note: <br />Concrete duct banks are required for <br />road crossings per the designed and <br />future roadways where heavy vehicles <br />travel over conduits. Duct banks <br />installed not under roadways shall be <br />properly compacted with sand/gravel <br />base with compacted overfill. AII <br />Page 1 of 3
The URL can be used to link to this page
Your browser does not support the video tag.