My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part 3.2.H - Delete the outbound <br />unattended enclosure note. <br />2.06 Hot Mixed Asphalt <br />Special Specification <br />5-04 Add Special Document No. 2 - Hot Mix <br />Asphalt Special Specifications to the <br />Special Document Section located after <br />Technica I Specifications. <br />2.07 Civil Site Details Sheet <br />c18 <br />Sheet C18 Add note under "Scale lnstallation <br />Notes" in Detailsection A/CI8: <br />THE CONTRACTOR SHALL COORDINATE <br />THE LOCATION OF THE SCALEHOUSE <br />TRANSACTION WINDOW AND THE <br />EDGE OF THE SCALE. THE SPACING <br />BETWEEN THE WINDOW AND EDGE OF <br />THE SCALE WILL BE A MAXIMUM OF 78 <br />INCHES. <br />2.08 Specification0T L326 07 7326 Change: 2.01.A2b to read "GCP <br />Bituthene 4000". <br />2.09 Specification 07 2270 07 2270 Delete Specification 07 2270 - Roof <br />Anchor Posts. <br />2.10 Specification 07 25 00 07 25 00 ln Specification 07 25 00 - Weather <br />Barriers, change Part 2.1.Bta to read <br />"GCP Perm A Barrier VPS 30". <br />2.rt Specification 08 1100 08 11 00 Specification 08 11 00 - Storefront is <br />added to Addendum No. 2. <br />2.r2 Specification 10 26 01 LO260L Delete Specification 10 26 01 - Wall <br />and Corner Guards. <br />2.r3 Specification 10 75 00 10 75 00 Delete Specification 10 75 00 - <br />Flagpoles. <br />2.1-4 Door Hardware <br />Substitution <br />The exit device substitution <br />(Dormakaba Precision 2000 Series) is <br />approved; however, the door closer <br />substitution ( Dormakaba QDC100 <br />Series) is rejected. <br />2.15 Hard-Cem Substitution The structural engineer has no <br />exception to the Hard-Cem lntegral <br />Hardening Admixture for concrete <br />finish. <br />2.16 Hi-Tech PE90 <br />Substitution <br />The structural engineer has no <br />exception to the Hi-Tech PE90 <br />substitution request for joint filler <br />END OF ADDENDUM NO. 2 <br />Page 2 of 3
The URL can be used to link to this page
Your browser does not support the video tag.