My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY - LOWER VATLEY TRANSFER STATION <br />ADDENDUM NO.2 <br />tuLY 2t,2024 <br />The above-referenced Contract Documents shall be amended as indicated in detail below. One signed <br />copyoftheCertificationpageshallbeincludedwiththebid. TheinclusionofthisAddendumwillbe <br />noted in the Agreement, and the execution of the Contract shall indicate full acceptance by all parties of <br />the provisions contained herein. All other provisions of the Plans, Specifications, and other Contract <br />Documents not noted in the Addendum shall remain unchanged and in full effect. This Addendum shall <br />be attached to and become a part of the Plans and Specifications for the project. <br />Addendum <br />Item <br />Document Section, Page <br />Number, or Sheet <br />Description of Change <br />2.01 Response to RFI <br />Questions List <br />Response to RFI Questions List is <br />hereby added and included in the <br />contract documents. <br />2,O2 Bid Schedule <br />Spreadsheet <br />Attached is the Addendum No. 1 Excel <br />spreadsheet that the contractor can <br />use for the bid. <br />2.O3 Electrical Drawings <br />Revision 2 <br />E200, E602, E603, <br />E70t <br />Replace electrical drawings E2O0, E602, <br />E603, and E701. <br />2.O4 Site Plan c3 Add the approximate unsuitable soil <br />stockpile location to Sheet C3. <br />2.05 Revised Specification <br />11 14 05 <br />tLL405 ln Specification 11 14 05 - Truck Scale, <br />change the following: <br />Part 2.2.A- Change "8O-foot" to "70- <br />foot". <br />Part 2.3.A - Change "80 feet" to "7O <br />feet". <br />Part 2.4.A - Change to "The load cell <br />shall be constructed of stainless steel." <br />Part 2.5.CC - Delete scale instrument <br />manufacturer note. <br />Part 2.8.H - Delete lightning protection <br />system manufactu rer note. <br />Part 3.2.G - Delete inbound <br />unattended enclosure note, <br />Page 1 of 3
The URL can be used to link to this page
Your browser does not support the video tag.