$ 5.1,2 A Sub-subcontractor is a person or entity who has a direct or indirect contract with a Subcontractor to
<br />perform a portion of the Work at the site. The term "Sub-subcontractor" is referred to throughout the Contract
<br />bocumenti as if singular in number and means a Sub-subcontractor or an authorized representative of the Sub-
<br />subcontractor.
<br />$ 5.2AWARD OF SUBCONTRACTS AND OTHER CoNTRACTS FOR PORTIONS 0F THE WORK
<br />$ 5.2.1 Unless otherwise stated in the Contract Documents or the bidding requirements, the Contractor, as soon as
<br />practicable after award of the Contract, shall furnish in writing to the Owner through the Architect the names of
<br />p..ronr or entities (including those who are to furnish materials or equipment fabricated to a special design)
<br />proposed for each principal portion of the Work. The Architect may reply within 14 days to the Contractor in
<br />wriiing stating (1) whether the Owner or the Architect has reasonable objection to any such proposed person or
<br />entity or (2) tia.t the Architect requires additional time for review. Failure of the Owner or Architect to reply within
<br />the l4-day period shall constitute notice of no reasonable objection.
<br />$ 5.2.2 The Contractor shall not conkact with a proposed person or entity to whom the Owner or Architect has made
<br />ieasonable and timely objection. The Contractor shall not be required to contract with anyone to whom the
<br />Contractor has made reasonable objection.
<br />S 5.2.3 If the Owner or Architect has reasonable objection to a person or entity proposed by the Contractor, the
<br />bontractor shall propose another to whom the Owner or Architect has no reasonable objection. If the proposed but
<br />rejected Subcontiacior was reasonably capable of performing the Work, the Conhact Sum and Contract Time shall
<br />be increased or decreased by the difference, ifany, occasioned by such change, and an appropriate Change Order
<br />shall be issued before commencement of the substitute Subcontractor's Work. However, no increase in the Contract
<br />Sum or Contract Time shall be allowed for such change unless the Contractor has acted promptly and responsively
<br />in submitting names as required.
<br />$ 5.2.4 The Contractor shall not substitute a Subcontractor, person or entity previously selected if the Owner or
<br />Architect makes reasonable objection to such substitution.
<br />$ 5,3 SUBCONTRACTUAL RELATIONS
<br />By appropriate agreement, written where legally required for validity, the Contractor shall require each
<br />Subcontractor, tJthe extent of the Work to be performed by the Subcontractor, to be bound to the Contractor by
<br />terms of the Conhact Documents, and to assume toward the Contractor all the obligations and responsibilities,
<br />including the responsibility for safety of the Subcontractor's Work, which the Contractor, by these Documents,
<br />ursum"rlo1l1ard ihe Owner and Architect. Each subcontract agreement shall preserve and protect the rights of the
<br />Owner and Architect under the Contract Documents with respect to the Work to be performed by the Subcontractor
<br />so that subcontracting thereofwill not prejudice such rights, and shall allow to the Subcontractor, unless specifically
<br />provided otherwise in the subcontract agreement, the benefit of all rights, remedies and redress against the
<br />bontractor that the Contractor, by the Contract Documents, has against the Owner. Where appropriate, the
<br />Contractor shall require each Subcontractor to enter into similar agreements with Sub-subconhactors. The
<br />Contractor shall make available to each proposed Subcontractor, prior to the execution of the subcontract agreement,
<br />copies of the Conhact Documents to which the Subcontractor will be bound, and, upon written request of the
<br />Subcontractor, identifu to the Subcontractor terms and conditions of the proposed subcontract agreement that may
<br />be at variance with the Contract Doctrments. Subconhactors will similarly make copies of applicable portions of
<br />such documents available to their respective proposed Sub-subconhactors.
<br />$ 5.4 CONTINGENT ASSIGNMENT OF SUBCONTRACTS
<br />$ S.l.t Each subcontract agreement for a portion of the Work is assigned by the Contractor to the Owner, provided
<br />that
<br />.1 assignment is effective only after termination of the Contract by the Owner for cause pursuant to
<br />Section 14.2 andonly for those subcontract agreements that the Owner accepts by notiffing the
<br />Subcontractor and Contractor in writing; and
<br />.2 assignment is subject to the prior rights of the surety, if any, obligated under bond relating to the
<br />Contract.
<br />When the Owner accepts the assignment of a subcontract agreement, the Owner assumes the Contractor's rights and
<br />obligations under the subcontract.
<br />AIA Document A2Ol - 2OO'1. Copyright @ 19r1, 1915' 19L8, 1925, 193'1, l95I' 1958' 1961, 1963, 19
<br />rights reserved, '.The American Institute of Architects," "American Institute of Architects," "
<br />Doiuments,, are trademarks of The American Institute of Architects. This draft was Produced at
<br />1.1o.4104243047 which expires o^ 06/lO/2024, is not for resale, is Iicensed for ooe-Line use onI
<br />the AIA Contract Docunentso Terms of Service. fo report copyright violations, e-naiI docitrfooa
<br />User Noteg:
<br />66, 1-910. l9-16' L98'1, 199? and 200?. AII
<br />AIA/ " the AIA Logo, and "AIA Contlact
<br />09:51:3? P"l oA 05/L3/2024 under Order
<br />y, and may only be used in accordance wiLh
<br />iacontracts . con.
<br />(116491601?)
<br />19
|