S 3.2.2 Because the Contract Documents are complementary, the Contractor shall, before starting each portion of the <br />Work, carefully study and compare the various Contract Documents relative to that portion of the Work, as well as <br />the information furnished by the Owner pursuant to Section 2.2.3, shall take field measurements of any existing <br />conditions related to that portion of the Work, and shall observe any conditions at the site affecting it. These <br />obligations are for the puqpose of facilitating coordination and construction by the Contractor and are not for the <br />purpose of discovering errors, omissions, or inconsistencies in the Contract Documents; however, the Contractor <br />ihall promptly report to the Architect any errors, inconsistencies or omissions discovered by or made known to the <br />Contractor as a request for information in such form as the Architect may require. It is recognized that the <br />Contractor's review is made in the Contractor's capacity as a contractor and not as a licensed design professional, <br />unless otherwise specifically provided in the Contract Documents. <br />S 3.2.3 The Contractor is not required to ascertain that the Contract Documents are in accordance with applicable <br />iaws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities, but the Contractor <br />shall promptly report to the Architect any nonconformity discovered by or made known to the Contractor as a <br />request for information in such form as the Architect may require. <br />S 3.2.4 If the Contractor believes that additional cost or time is involved because of clarifications or instructions the <br />Architect issues in response to the Contractor's notices or requests for information pursuant to Sections 3.2.2 or <br />3.2.3,the Contractor shall make Claims as provided in Article 15. If the Contractor fails to perform the obligations <br />of Sections 3.2.2 or 3 .2.3, the Contractor shall pay such costs and damages to the Owner as would have been <br />avoided if the Contractor had performed such obligations. If the Contractor perfiorms those obligations, the <br />Contractor shall not be liable to the Owner or Architect for damages resulting from errors, inconsistencies or <br />omissions in the Contract Documents, for differences between field measurements or conditions and the Contract <br />Documents, or for nonconformities of the Contract Documents to applicable laws, statutes, ordinances, codes, rules <br />and regulations, and lawful orders of public authorities. <br />$ 3.3 SUPERVISION AND CoNSTRUCTION PROCEDURES <br />5 f.f.t The Conhactor shall supervise and direct the Work, using the Contractor's best skill and attention. The <br />Contractor shall be solely responsible for, and have control over, construction means, methods, techniques, <br />sequences and procedures and for coordinating all portions of the Work under the Contract, unless the Contract <br />Documents give other specific instructions concerning these matters. If the Contract Documents give specific <br />instructions ionceming construction means, methods, techniques, sequences or procedures, the Contractor shall <br />evaluate the jobsite safety thereof and, except as stated below, shall be fully and solely responsible for the jobsite <br />safety of such means, methods, techniques, sequences or procedures. If the Conhactor determines that such means, <br />methods, techniques, sequences or procedures may not be safe, the Contractor shall give timely written notice to the <br />Owner and Architect and shall not proceed with that portion of the Work without further written instructions from <br />the Architect. If the Contractor is then instructed to proceed with the required means, methods, techniques, <br />sequences or procedures without acceptance ofchanges proposed by the Contractor, the Owner shall be solely <br />responsible for any loss or damage arising solely from those Owner-required means, methods, techniques, sequences <br />or procedures. <br />S 3.3.2 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor's employees, <br />Subcontractors and their agents and employees, and other persons or entities performing portions of the Work for, or <br />on behalfof, the Contractor or any ofits Subcontractors. <br />$ 3.3.3 The Contractor shall be responsible for inspection of portions of Work already performed to determine that <br />such portions are in proper condition to receive subsequent Work. <br />s 3.4 LABOR AND MATERIALS <br />$ f.n.t Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for labor, <br />materials, equipment, tools, construction equipment and machinery, water, heat, utilities' transportation, and other <br />facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent <br />and whether or not incorporated or to be incorporated in the Work. <br />$ 3.4,2 Except in the case of minor changes in the Work authorized by the Architect in accordance with Sections <br />i. t Z.g o. 7 .i, the Contractor may make substitutions only with the consent of the Owner, after evaluation by the <br />Architect and in accordance with a Change Order or Construction Change Directive. <br />AIA Document A2O1 - 2OO'1. Copyright @ 1911. 1915, 1918, L925, 193'1, 195I,1958, 1951, 1963, f966' 19'70, 1916' L9 <br />tights reserved. '..I.he American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo <br />Documents,, are tradenarks of The Anerican fnstiLute of Architects. This draft was produced at 09:51:3? PT on 05/ <br />No.410424304? whj.ch expires o^ 06/lO/2024, is not for resale, is Iicensed fo! one-time use only, and nay only be <br />the AIA Contract Documentso Terns of Setvice. To report coPyright violations, e-mail docinfoGaiacontracts.com. <br />User Notes: <br />8'7, 199'l and 2007. AII <br />, and "AIA Contract <br />13/2024 under o!de! <br />used in accordance with <br />(1164916017) <br />L2