Laserfiche WebLink
S 2,2,2 Except for permits and fees that are the responsibility of the Contractor under the Contract Documents, <br />including those required under Section 3.7.l, the Owner shall secure and pay for necessary approvals, easements, <br />assessments and charges required for construction, use or occupancy of permanent structures or for permanent <br />changes in existing facilities. <br />$ 2.2.3 The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for <br />the site ofthe Project, and a legal description ofthe site. The Contractor shall be entitled to rely on the accuracy of <br />information furnished by the Owner but shall exercise proper precautions relating to the safe performance of the <br />Work. <br />$ 2.2.4 The Owner shall furnish information or services required of the Owner by the Contract Documents with <br />reasonable promptness. The Owner shall also furnish any other information or services under the Owner's control <br />and relevant to the Contractor's performance of the Work with reasonable promptness after receiving the <br />Contractor's written request for such information or services. <br />$ 2.2.5 Unless otherwise provided in the Contract Documents, the Owner shall furnish to the Contractor one copy of <br />the Contract Documents for purposes of making reproductions pursuant to Section 1.5.2. <br />$ 2,3 OWNER'S RIGHT TO STOP THE WORK <br />If the Contractor fails to correct Work that is not in accordance with the requirements of the Contract Documents as <br />required by Section 1.2.2 or repeatedly fails to carry out Work in accordance with the Contract Documents, the <br />Owner may issue a written order to the Contractor to stop the Work, or any portion thereof, until the cause for such <br />order has been eliminated; however, the right of the Owner to stop the Work shall not give rise to a duty on the part <br />of the Owner to exercise this right for the benefit of the Contractor or any other person or entity, except to the extent <br />required by Section 6.1.3. <br />s 2.4 oWNER'S RIGHT TO CARRY oUT THE WORK <br />If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails <br />within a ten-day period after receipt of written notice from the Owner to commence and continue correction of such <br />default or neglect with diligence and promptness, the Owner may, without prejudice to other remedies the Owner <br />may have, correct such deficiencies. In such case an appropriate Change Order shall be issued deducting from <br />payments then or thereafter due the Contractor the reasonable cost of correcting such deficiencies, including <br />bwner's expenses and compensation for the Architect's additional services made necessary by such default, neglect <br />or failure. Such action by the Owner and amounts charged to the Contractor are both subject to prior approval of the <br />Architect. If payments then or thereafter due the Contractor are not sufficient to cover such amounts, the Contractor <br />shall pay the difference to the Owner. <br />ARTICLE 3 CONTRACTOR <br />$ 3.1 GENERAL <br />S 3.1.1 The Conhactor is the person or entily identified as such in the Agreement and is referred to throughout the <br />Contract Documents as if singular in number. The Contractor shall be lawfully licensed, if required in the <br />jurisdiction where the Project is located. The Contractor shall designate in writing a representative who shall have <br />express authority to bind the Contractor with respect to all matters under this Contract. The term "Contractor" means <br />the Contractor or the Contractor's authorized representative. <br />$ 3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents. <br />$ 3.1.3 The Contractor shall not be relieved of obligations to perform the Work in accordance with the Contract <br />Documents either by activities or duties of the Architect in the Architect's administration of the Contract, or by tests, <br />inspections or approvals required or performed by persons or entities other than the Contractor. <br />$ 3.2 REVIEW OF CONTRACT DoCUMENTS AND FIELD CoNDITIoNS BY CONTRACToR <br />$ 3,2.1 Execution of the Contract by the Contractor is a representation that the Contractor has visited the site, <br />become generally familiar with local conditions under which the Work is to be performed and correlated personal <br />observations with requirements of the Contract Documents. <br />ArA Document A2O\ - 2OO'7. Copyright O 1911, 1915, 19L8, 1925, L93'1, I95I, 1958' 1961, 1963, L966' l9'70, L9'16, 798 <br />rights reserved. "The American Institute of ArchitecLs," "American Institute of Alchitects," t'AIA/" the AIA Logo, <br />Documents,'are tradenarks of The American Institute of Architects. This draft was produced at 09:51:3? PT on 05/1 <br />No.410424304? whi-ch expires o^ 06/IO/2024, is not for resale, is ticensed for one-time use on1y, and may onLy be <br />the AIA Contract Documentso terms of Service, to report copyright violations, e-nai.L docinfoGalacontlacts.com. <br />Uger Noteg: <br />7. 199? and 200?. AII <br />and "AIA Contract <br />3/2024 under order <br />used in accordance with <br />(115491 601?) <br />11