My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SH24-009 PSA-Jail PLC Replacement Rev. 1 includes sales tax
>
Meetings
>
2024
>
09. September
>
2024-09-17 10:00 AM - Commissioners' Agenda
>
SH24-009 PSA-Jail PLC Replacement Rev. 1 includes sales tax
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 1:17:33 PM
Creation date
9/12/2024 1:15:51 PM
Metadata
Fields
Template:
Meeting
Date
9/17/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Professional Services Agreement between Kittitas County and Accurate Electric Unlimited, Inc.
Order
5
Placement
Consent Agenda
Row ID
122274
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "B" <br />COMPENSATION <br />Warranty: <br />The new PLC is provided with a 1-year warranty. AEU will require remote access to the <br />system through the internet to support the warranty. AEU has included in this proposal a <br />maintenance computer on site, connected to the security network. AEU has not included <br />any internet access costs with this proposal. <br />Schedule: <br />AEU will provide a project schedule in CPM format with milestones or engineering, <br />permits, material deliveries, installation, and startup. The work is expected to require <br />approximately 280 calendar days to complete, subject to delays in supply chain delivery. <br />Cost: <br />The above is offered for the sum of $141,297.00 plus sales tax $11,868.95 totaling <br />$153,165.95. <br />Escalation: <br />This proposal is conditioned upon the ability to complete the project offered at present <br />prices for materials and equipment. If AEU is unable to complete the above -described <br />project without significate price increases of current prices for materials and equipment, <br />the contract sum shall be equitably adjusted to compensate for increased costs. A change <br />in price of an item of material or equipment will be considered significant when the price <br />increases 15% between the date of this proposal and the date of the applicable work. <br />This proposal is subject to the execution of a mutually negotiated contract and project <br />schedule acceptable to AEU. <br />Professional Services Agreement (rev. 09/24/2018) <br />Page 14 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.