My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AIA 101 Agreement 08302024
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
AIA 101 Agreement 08302024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2024 9:02:50 AM
Creation date
9/3/2024 8:43:00 AM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Notes
Lower Valley TS Contract signed by contractor
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. if the undersigned fails to complete the above requirements, total <br />amount of Bid Security shall be forfeited to the Owner. <br />6. CONTRACT TIME: <br />A. Work shall be substantially complete and ready for Owner's use within <br />450 calendar days of Notice to Proceed. <br />B. Liquidated Damages. Should the Contractor fail to complete the Work <br />within the Contract Time, as revised by approved extensions, the Owner <br />shall reserve the right to assess the Contractor liquidated damages in <br />the sum of five hundred dollars ($500) per calendar day or as modified <br />in the Contract until such time as the Work is substantially complete. <br />See Section 8.24 of the Supplementary General Conditions for <br />additional requirements for Liquidated Damages_ <br />BID AMOUNTS: <br />A. The bid amounts provided shall not include Washington State Sales Tax - <br />The bid amounts shall be written out in words as well as figures. In <br />case of discrepancy, the written form takes precedence over the <br />numerals. <br />8. BASE BID: <br />Contractor shall complete the Did Schedule in Section 00 00 04.1 and insert Base Bid total <br />below. <br />A. Base Bid: <br />(Written) <br />(Numerical) <br />9. All Subcontractors, or Sub -Subcontractors with whom a contract in an amount <br />greater than 10% of the total Base Bid is anticipated, must be listed below for <br />consideration for Award of Contract. List name of Subcontractor category of <br />Work intended to be performed by their respective forces, and the dollar value <br />of their portion of the Work. <br />Subcontractor <br />Contract Amount <br />L'VIOCO - Coke ($ 30i o00.00 y <br />Kittitas County — Lower Valley 2 of 3 Bid Proposal Form <br />Transfer Station June 18, 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.