§ 5.3 Acceptance of Bid (Award) <br />§ 5.3.1 It is the intent of the Owner to award a Contract to the lowest responsive and responsible Bidder, provided the <br />Bid has been submitted in accordance with the requirements of the Bidding Documents. Unless otherwise prohibited by <br />law, the Owner shall have the right to waive informalities and irregularities in a Bid received and to accept the Bid <br />which, in the Owner's judgm ent, is in the Owner's best interests. <br />§ 5.3.2 Unless otherwise prohibited by law, the Owner shall have the right to accept Alternates in any order or <br />combination, unless otherwise specifically provided in the Bidding Documents, and to determine the lowest responsive <br />and responsible Bidder on the basis of the sum of the Base Bid and Alternates accepted. <br />ARTICLE 6 POST -BID INFORMATION <br />§ 6.1 Contractor's Qualification Statement <br />Bidders to whom award of a Contract is under consideration shall submit to the Architect, upon request and within the <br />timeframe specified by the Architect, a properly executed AIA Document A305T'I Contractor's Qualification <br />Statement, unless such a Statement has been previously required and submitted for this Bid. <br />§ 6.2 Owner's Financial Capability <br />A Bidder to whom award of a Contract is under consideration may request in writing, fourteen days prior to the <br />expiration of the time for withdrawal of Bids, that the Owner furnish to the Bidder reasonable evidence that financial <br />arrangements have been made to fulfill the Owner's obligations under the Contract. The Owner shall then furnish such <br />reasonable evidence to the Bidder no later than seven days prior to the expiration of the time for withdrawal of Bids. <br />Unless such reasonable evidence is furnished within the allotted time, the Bidder will not be required to execute the <br />Agreement between the Owner and Contractor. <br />§ 6.3 Submittals <br />§ 6.3.1 After notification of selection for the award of the Contract, the Bidder shall, as soon as practicable or as <br />stipulated in the Bidding Documents, submit in writing to the Owner through the Architect: <br />.1 a designation of the Work to be performed with the Bidder's own forces; <br />.2 names of the principal products and systems proposed for the Work and the manufacturers and suppliers <br />of each; and <br />.3 names of persons or entities (including those who are to furnish materials or equipment fabricated to a <br />special design) proposed for the principal portions of the Work. <br />§ 6.3.2 The Bidder will be required to establish to the satisfaction of the Architect and Owner the reliability and <br />responsibility of the persons or entities proposed to furnish and perform the Work described in the Bidding Documents. <br />§ 6.3.3 Prior to the execution of the Contract, the Architect will notify the Bidder if either the Owner or Architect, after <br />due investigation, has reasonable objection to a person or entity proposed by the Bidder. If the Owner or Architect has <br />reasonable objection to a proposed person or entity, the Bidder may, at the Bidder's option, withdraw the Bid or submit <br />an acceptable substitute person or entity. The Bidder may also submit any required adjustment in the Base Bid or <br />Alternate Bid to account for the difference in cost occasioned by such substitution. The Owner may accept the adjusted <br />bid price or disqualify the Bidder. In the event of either withdrawal or disqualification, bid security will not be forfeited <br />§ 6.3.4 Persons and entities proposed by the Bidder and to whom the Owner and Architect have made no reasonable <br />objection must be used on the Work for which they were proposed and shall not be changed except with the written <br />consent of the Owner and Architect. <br />ARTICLE 7 PERFORMANCE BOND AND PAYMENT BOND <br />§ 7.1 Bond Requirements <br />§ 7.1.1 If stipulated in the Bidding Documents, the Bidder shall furnish bonds covering the faithful performance of the <br />Contract and payment of all obligations arising thereunder. <br />§ 7.1.2 If the furnishing of such bonds is stipulated in the Bidding Documents, the cost shall be included in the Bid If <br />the furnishing of such bonds is required after receipt of bids and before execution of the Contract, the cost of such bonds <br />shall be added to the Bid in determining the Contract Sum. <br />§ 7.1.3 The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds <br />in the jurisdiction where the Project is located. <br />AIA Document A701 - 2018, Copyright 9 19?0, 1974, 1978, 1987, 1997 and 2D18. A11rights reserved. "The American Institute of Architects," <br />"American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of <br />Aeah itects. This draft was produced at 09,50:34 PT on 05/13/2024 under order No.4104243047 which expires on 06/10/2024, is not for resale, 6 <br />is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documentse Terms of service. To report <br />copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (945244259) <br />Kittitas County — Lower Valley 6 of 8 Instructions to Bidders <br />Transfer Station (AIA Document A701) <br />June 18, 2024 <br />