Laserfiche WebLink
1) Sheet E603 & E701-The <br />electrical panel PP -ASP is <br />changed from a 120/208V 3ph <br />panel to a 277/480V 3ph panel <br />as shown on the one -line and <br />in the schedules. <br />2) Sheet E701- There is a minor <br />adjustment on the one -line for <br />the main switchboard —two <br />circuit breakers have been <br />updated to the correct size and <br />location. <br />3) Sheet E701- The notes indicate <br />the irrigation pump enclosure <br />will require a stepdown <br />transformer and it is identified <br />as being supplied by the <br />irrigation pump manufacturer. <br />4) Drawing E200 was added to <br />identify the required conduit <br />and wiring for the aeration and <br />recirculation pump power and <br />controls. <br />1.12.1 <br />Revised Civil Drawings <br />Sheets C20, C24, <br />Revised drawings are added to <br />C27 <br />Addendum No. 1. <br />1.13 <br />Revised Specification <br />Section 40 95 13 <br />Revised specification is added to <br />Section 40 95 13 Control <br />Addendum No. 1. <br />Panels, VFDS, and RMC <br />1.14 <br />Water Recirculation <br />Section 40 95 14 <br />New specification is added to <br />System Specification <br />Addendum No. 1 for Leachate Pond <br />water recirculation system. <br />1.15 <br />Dewatering <br />Section 0150 00 <br />Add following statement at the end of <br />Part 1.9, <br />the paragraph of Part 1.9, subsection B <br />Subsection B <br />in Section 0150 00: <br />If dewatering is required, the <br />Contractor will be required to build <br />temporary sedimentation ponds or <br />sedimentation trap BMPs which <br />discharge to the project storm system <br />in accordance with State of Washington <br />- Department of Ecology - 2019 <br />Stormwater Management Manual for <br />Eastern Washington, Chapter 7, <br />Element #10, Page 769. Alternately, <br />BMPs can drain to a temporary gravity <br />or pumped conveyance system draining <br />Page 3of5 <br />