My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AIA 101 Agreement 08302024
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
AIA 101 Agreement 08302024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2024 9:02:50 AM
Creation date
9/3/2024 8:43:00 AM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Notes
Lower Valley TS Contract signed by contractor
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.06 <br />Bid Item Schedule <br />Section 00 00 04.1 <br />Replace Section 00 00 04.1 Bid <br />Schedule with the attached revised bid <br />schedule. Changed seeding to unit <br />price, and added landscape bid item <br />(lump sum). <br />Contractor must provide price for all <br />four (4) additive alternative bid items. <br />Contractor will be selected on lowest <br />responsive base bid. Depending on <br />base bid price and available funding, <br />the County may include additive <br />alternative bid items to the contract. <br />1.06.1 <br />Revised Bid Proposal <br />Section 00 00 04 <br />Replace existing bid proposal form with <br />Form <br />revised form. <br />1.07 <br />Measurement and <br />Section 00 43 01 <br />Replace Measurement and Payment <br />Payment Section <br />section in its entirety. Revised seeding <br />bid item to unit price and added <br />Landscape bid item No. 20. <br />1.08 <br />Civil AUTOCAD Files <br />-- <br />Civil AUTOCAD files are available upon <br />request. Contact Danny Duong <br />(DDuong@scsengineers.com). <br />1.09 <br />Section 010100 <br />Section 010100 <br />Section 010100 is added to Addendum <br />Summary of Work <br />No. 1. Construction of the compost <br />area lined leachate ponds shall not <br />start until July/August 2025. <br />1.10 <br />Section 0104 00 <br />Section 0104 00 <br />Please add under Subsection H the <br />Coordination with <br />Part 13.1 <br />following statement: <br />Others <br />Subsection I <br />CONTRACTOR shall use Trimble <br />ProjectSight for the construction <br />management software. OWNER will <br />provide and pay far a maximum of two <br />(2) licenses to the general contractor <br />for the duration of the project. <br />1.11 <br />Lighting Substitution <br />-- <br />The Lighting Substitution submittal is <br />Approval <br />approved and added to Addendum No. <br />1. <br />1.12. <br />Revised Electrical <br />Drawings E200, <br />The following changes and additions <br />Drawings <br />E602, E603, E701 <br />are shown on the revised electrical <br />drawings. <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.