My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 2
>
Meetings
>
2024
>
08. August
>
2024-08-06 10:00 AM - Commissioners' Agenda
>
Amendment No. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2024 12:39:38 PM
Creation date
8/21/2024 12:39:31 PM
Metadata
Fields
Template:
Meeting
Date
8/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Amendment No.2 to a Professional Service Agreement with Parametrix
Order
3
Placement
Consent Agenda
Row ID
120774
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ParametriX Scope of Work <br />'.,r'a\si,{ j.{} -- fi(}A{, g*"'",*.r:uit:ia.1. :,*nwi:.:*rirL-nes*t"="}. I'l.4ieln:i,"t'ru;;:i:trtcri <br />{Ai'evir} <br />Objective <br />The goal of this task is to perform, coordinate, conduct, and report for the 2024 environmental <br />monitoring at the Ryegrass Facility for the Balefill and the LPL in accordance with the updated <br />Environmental Monitoring Plan and WAC 173351and WAC 173-350-400. This work will be <br />performed through the 2024 annual environmental monitoring report due to agencies by April 1, <br />2425. <br />S,ctivities <br />For this task we will complete the following: <br />. Project management and monthly progress reports <br />r Coordinate with HWA regarding groundwater monitoring <br />r Collect quarterly LFG measurements from 17 perimeter monitoring locations surrounding the <br />LPL (GM-1thru GM-8) and the Balefill (GMB-Ithru GMB-9) in accordance with the Draft LFG <br />Monitoring Plan <br />r Modify the 26 Balefill gas vents to add a ball valve and labcock valve forsampling <br />c Collect quarterly LFG measurements from the 26 gas vents of the Balefill in accordance with <br />the Draft LFG Monitoring Plan <br />r Conduct follow-up actions in accordance with the Draft LFG Monitoring Plan if necessary <br />r Tabulate and report LFG concentrations to regulatory agencies <br />r Tabulate and perform data validation on quarterly groundwater monitoring data <br />. Upload data into the Sanitas@ software program and perform analysis consistent with the <br />SAP <br />e Prepare a report for each of the First, Second, and Third quarters. <br />r Prepare groundwater data for submittal into Ecology's Environmental lnformation <br />Management {ElM) database. <br />. Coordinate with field staff and review sampling documentation and procedures. <br />r Coordinate with agencies regarding quarterly groundwater and landfill gas results. <br />. Prepare the 2O24 annual environmental monitoring report. The annual report will include <br />evaluatingthe data in accordance with the statistical approach presented in the Draft SAP <br />and2oZ3Annual Report <br />Kiuitas County Solid Waste <br />Hyegrass LPL and Future Uses <br />Amendment 02 <br />5 <br />553-1763'010 <br />)une2A24
The URL can be used to link to this page
Your browser does not support the video tag.