My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-07-22-minutes-public-works-&-cds-study-session
>
Meetings
>
2024
>
08. August
>
2024-08-06 10:00 AM - Commissioners' Agenda
>
2024-07-22-minutes-public-works-&-cds-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 1:31:29 PM
Creation date
8/1/2024 1:14:45 PM
Metadata
Fields
Template:
Meeting
Date
8/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
120774
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.4 Environment <br />Environmental resources and existing <br />conditions were identified within 500 feet of <br />the alternative alignments to provide a high- <br />level preliminary desktop environmental <br />review for which potential opportunities, <br />benefits and challenges for the proposed <br />alternatives may occur. The 500-foot buffer <br />comprises the environmental study area for <br />each alternative. The preliminary desktop <br />review was developed by qualitatively <br />evaluating aquatic resources, wildlife <br />connectivity, ecosystem resiliency, and <br />Endangered Species Act (ESA) critical habitats <br />in the vicinity of the proposed alignment <br />of each alternative. Further studies and <br />assessments will need to occur for each <br />resource once the preferred alternative <br />is selected to move forward for further <br />evaluation. <br />Existing conditions for environmental <br />resources in the study areas are described <br />in the following sections and illustrated in <br />Appendix B. <br />3.4.1 Aquatic Resources <br />Streams and Rivers <br />Streams and rivers identified within the <br />study area of Alternatives 1 through 3 include <br />the Yakima River, Cie Elum River, Big Creek, <br />Little Creek, Tucker Creek, Crystal Creek, <br />Nelson Creek, and Silver Creek, as well as <br />three additional unnamed perennial and two <br />unnamed intermittent streams (Appendix B, <br />Map 1A). Streams mapped within the study area <br />of Alternative 4A include Silver Creek, Domerie <br />Creek, the Cie Elum River, and several unnamed <br />perennial and intermittent streams (Appendix <br />B, Map 113). The study area of Alternative 4B <br />includes Silver Creek, the Cie Elum River, and <br />several unnamed perennial and intermittent <br />CHAPTER 3: EXISTING CONDITIONS IN THE SIUDYAREA <br />streams (Appendix B, Map 1C). The Cie Elum <br />River is adjacent to Alternative 4B. The study <br />area for Alternative 5 includes the Yakima <br />River, Big Creek, Little Creek, Nelson Creek, <br />Peterson Creek, Silver Creek, Spex Arth Creek, <br />Tillman Creek, Tucker Creek, the Kittitas <br />Reclamation District Main Canal, and several <br />unnamed intermittent and perennial streams <br />(Appendix B, Map 1D). <br />Lakes and Ponds <br />Lake Easton is within the study areas for all <br />alternatives. Lavendar Lake as well as several <br />unnamed bodies of water are within the study <br />area for Alternatives 1 through 3. No additional <br />bodies of water are located within the study <br />areas of Alternatives 4A or 4B. Hanson Ponds to <br />the south of Cie Elum are within the study area <br />for Alternatives 1 through 3 and Alternative 5. <br />Wetlands <br />The proposed alignment for Alternatives 1 <br />through 3 is within or adjacent to wetland <br />complexes associated with the Yakima and Cie <br />Elum Rivers. The National Wetlands Inventory <br />(NWI) maps several wetland complexes along <br />these alternatives given the proximity to <br />these rivers along the extent of the alignment. <br />The proposed alignment for Alternative 4A <br />appears to bypass NWI mapped wetland areas <br />but crosses the Cie Elum River, which may <br />include wetlands. The proposed alignment for <br />Alternative 4B is within or adjacent to the Cie <br />Elum River, which may include associated or <br />adjacent wetlands. The proposed alignment <br />for Alternative 5 is within or adjacent to the <br />Yakima River, which may include adjacent <br />and associated wetlands. NWI is a broadscale <br />mapping tool for desktop review prior to <br />fieldwork. There are likely wetlands along <br />each alignment that are not mapped within <br />NWI and wetlands that are mapped within NWI <br />may not meet all three indicators (vegetation, <br />VOLUME I: FEASIBILITY REPORT 1-90 Corridor Easton to Cle Elum Feasibility Study 1 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.