My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-07-22-minutes-public-works-&-cds-study-session
>
Meetings
>
2024
>
08. August
>
2024-08-06 10:00 AM - Commissioners' Agenda
>
2024-07-22-minutes-public-works-&-cds-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 1:31:29 PM
Creation date
8/1/2024 1:14:45 PM
Metadata
Fields
Template:
Meeting
Date
8/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
120774
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS <br />STUDY SESSION STAFF REPORT <br />STUDY SESSION DATE: July 22, 2024 <br />TOPIC: Interstate 90 Corridor Easton to Cle Elum <br />Feasibility Study <br />ACTION REQUESTED: None Required <br />LEAD STAFF: <br />Joshua Fredrickson <br />RECOMMENDATION: <br />No action required. <br />BRIEFING SUMMARY: <br />• Interstate 90 traffic bypasses slowdowns by using County road network. <br />• Feasibility study performed to identify alternatives. <br />• Two primary alternatives have been identified: <br />1. Widening I-90 to the inside <br />2. Constructing a reversible lane <br />• Next steps are to pursue environmental phases. <br />BACKGROUND: <br />For the past several years, Kittitas County has experienced an increase of Interstate 90 (I- <br />90) traffic bypassing onto local roads during 1-90 closures and slowdowns. This was <br />confirmed through the efforts of the Upper County Traffic Committee (UCTC) and traffic <br />engineering consultant Fehr & Peers. When developing a project for traffic calming <br />devices, it was identified that I-90 traffic was working to bypass slowdowns and backups <br />on I-90 by using the County road network. Public Works subsequently proposed a <br />feasibility study and allocated funding on the State Transportation Improvement Plan <br />(STIP) in 2022. Through a competitive Statement of Qualifications process consulting <br />services of SCJ Alliance were secured in July 2022. <br />DISCUSSION: <br />Kittitas County sought to understand and identify the effective manner to address I-90 <br />traffic bypassing onto local roadways between Easton (MP 70) to Cle Elum/SR 970 (MP <br />85). Current State efforts include widening I-90 west of Easton (MP 70). The County <br />identified this location as a possible bottleneck, as there is not a location for traffic to <br />disperse at Easton. <br />
The URL can be used to link to this page
Your browser does not support the video tag.