Laserfiche WebLink
CHAPTER 6: NEXT STEPS <br />6.7 Immediate Next Steps <br />In the coming months, following the release of <br />this final document, the County will: <br />• Make this document available for public <br />review and input. Comments received <br />on this document will be reviewed and <br />considered as part of the environmental <br />scoping process. <br />• Continue to pursue funding opportunities <br />to move this project forward into <br />preliminary design and environmental <br />analysis. <br />• Keep the public and stakeholders updated <br />via the STEER 1-90 website and periodic <br />presentations to the STEER 1-90 Coalition. <br />• Confer with WSDOT (and FHWA if <br />necessary) to determine the level of NEPA <br />documentation that will be required and <br />whether a HEAL Act Environmental Justice <br />Assessment will be required. <br />VOLUME 1: FEASIBILITY REPORT 1-90 Corridor - Easton to Cle Elum Feasibility Study 1 86 <br />