My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-07-22-minutes-public-works-&-cds-study-session
>
Meetings
>
2024
>
08. August
>
2024-08-06 10:00 AM - Commissioners' Agenda
>
2024-07-22-minutes-public-works-&-cds-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 1:31:29 PM
Creation date
8/1/2024 1:14:45 PM
Metadata
Fields
Template:
Meeting
Date
8/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
120774
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSDOT will continue to work closely with the <br />County and form an interdisciplinary team of <br />WSDOT engineers, planners, and environmental <br />specialists to review findings and help guide <br />the NEPA process. <br />Outreach activities during the environmental <br />process may include: <br />• Compilation, review, and consideration <br />of public comments received on this <br />feasibility study. <br />• Continued coordination with the Yakama <br />and Snoqualmie Tribes, as well as other <br />interested Tribes. <br />• Outreach to disadvantaged and <br />overburdened communities. <br />• Maintenance of the STEER 1-90 Coalition <br />website with up-to-date information and <br />project materials. <br />• Online open houses to provide project <br />progress updates to the surrounding <br />communities and solicit input. <br />• Regular briefings with non -governmental, <br />community organizations and other groups <br />that have requested them. <br />6.5 NEPA Preferred <br />Alternative, Final Design, <br />and Implementation <br />Following completion of the NEPA and SEPA <br />documents, and the identification of a Preferred <br />Alternative, permit applications will be prepared <br />and submitted to agencies with jurisdiction, and <br />the final design will be completed. <br />Once funding, design, and approvals are in <br />place, construction of the project can begin, <br />CHAPTER 6: NEXT STEPS <br />pending local, state and federal funding. <br />Construction phasing and timelines will be <br />provided in the NEPA/SEPA documents and <br />revised as needed once funding is secured. It <br />is anticipated public engagement will continue <br />through the construction phase. <br />6.6 Other Opportunities <br />for 1-90 in the Study Area <br />In addition to the proposed project, other <br />short-term solutions can be investigated for <br />implementation while environmental and <br />design activities progress. These solutions are <br />discussed in Chapter 2, and include: <br />• Intelligent Transportation System <br />Infrastructure (ITS) updates to the corridor. <br />• Commercial Truck Parking Facilities (public <br />or private) within or outside of the existing <br />right of way. <br />• Road safety improvements on County roads <br />outside of the 1-90 Corridor study area. <br />• Continue collaborating with residents to <br />identify short-term methods of managing/ <br />communicating surges of traffic on County <br />roads. <br />• Work with online mapping services/sources <br />to discourage traffic re-routing of interstate <br />traffic onto County roads not sized or <br />designed for large increases in traffic <br />volumes. <br />• Passenger rail service to the area, although <br />a longer -term solution, can also alleviate <br />some traffic congestion along 1-90 corridor <br />in the study area. <br />VOLUME I: FEASIBILITY REPORT 1-90 Corridor- Easton to Cle Elum Feasibility Study 18S <br />
The URL can be used to link to this page
Your browser does not support the video tag.