My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 _07312024
>
Meetings
>
2024
>
08. August
>
2024-08-06 10:00 AM - Commissioners' Agenda
>
Amendment No 2 _07312024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 1:11:05 PM
Creation date
8/1/2024 1:10:08 PM
Metadata
Fields
Template:
Meeting
Date
8/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Amendment No.2 to a Professional Service Agreement with Parametrix
Order
3
Placement
Consent Agenda
Row ID
120774
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parametrik <br />Objective <br />Scope of Work <br />The goal of this task is to perform, coordinate, conduct, and report for the 2024 environmental <br />monitoring at the Ryegrass Facility for the Balefill and the LPL in accordance with the updated <br />Environmental Monitoring Plan and WAC 173-351 and WAC 173-350-400. This work will be <br />performed through the 2024 annual environmental monitoring report due to agencies by April 1, <br />2025. <br />Activities <br />For this task we will complete the following: <br />• Project management and monthly progress reports <br />• Coordinate with HWA regarding groundwater monitoring <br />• Collect quarterly LFG measurements from 17 perimeter monitoring locations surrounding the <br />LPL (GM-1 thru GM-8) and the Balefill (GMB-1 thru GMB-9) in accordance with the Draft LFG <br />Monitoring Plan <br />• Modify the 26 Balefill gas vents to add a ball valve and labcock valve for sampling <br />• Collect quarterly LFG measurements from the 26 gas vents of the Balefill in accordance with <br />the Draft LFG Monitoring Plan <br />• Conduct follow-up actions in accordance with the Draft LFG Monitoring Plan if necessary <br />• Tabulate and report LFG concentrations to regulatory agencies <br />• Tabulate and perform data validation on quarterly groundwater monitoring data <br />• Upload data into the Sanitas® software program and perform analysis consistent with the <br />SAP <br />• Prepare a report for each of the First, Second, and Third quarters. <br />• Prepare groundwater data for submittal into Ecology's Environmental Information <br />Management (EIM) database. <br />• Coordinate with field staff and review sampling documentation and procedures. <br />• Coordinate with agencies regarding quarterly groundwater and landfill gas results. <br />• Prepare the 2024 annual environmental monitoring report. The annual report will include <br />evaluating the data in accordance with the statistical approach presented in the Draft SAP <br />and 2023 Annual Report <br />Kittitas County Solid Waste 553-1763-010 <br />Ryegrass LPL and Future Uses 5 June 2024 <br />Amendment02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.