My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7-22-2024_PW_CDS SS Briefings
>
Meetings
>
2024
>
07. July
>
2024-07-22 1:30 PM - Public Works & CDS Study Session
>
7-22-2024_PW_CDS SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 11:25:31 AM
Creation date
7/18/2024 11:11:48 AM
Metadata
Fields
Template:
Meeting
Date
7/22/2024
Meeting title
Public Works & CDS Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 4: ALTERNATIVES EVALUATION CRITERIA <br /> Figure 4-1 Tier 1 Evaluation Summary by Alternative- Weighted Score <br /> 80.0 <br /> 70.0 <br /> 60,0 <br /> 50.0 <br /> 40.0 <br /> 30.0 <br /> 20.0 <br /> 30.0 <br /> 0.0 <br /> Alt 1 Alt 2 AI[3 AI[4A Alt 48 Alt S Alt 6 <br /> •Relative Cost of Alternatives 3.3 3.3 3.3 OA 0.0 1.7 6.7 <br /> ■Equity/Inclusion 6,7 9.3 8.3 5.0 6.7 5.0 5.0 <br /> •Resiliency 9.4 9.4 9.4 1.9 1.9 1.9 0.0 <br /> •Environmental 6.0 9.0 9.0 1.5 1.5 0.0 2.5 <br /> •Freight Mobility 6.7 6.7 6.7 1.7 1.7 5.0 0.0 <br /> •safety 21,0 21.0 24.0 1&0 18.0 12,0 0.0 <br /> •TransportationDemand 8.6 8.6 8.6 4.3 4.3 2.9 0.0 <br /> ■Transportation Demand ■Safety Freight Mobility •Environmental •Resiliency •Equity/Inclusion ■Relative Cost of Alternatives <br /> VOLUME 1: FEASIBILITY REPORT 1-90 Corridor- Easton to Cle Elum Feasibility Study 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.