My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7-22-2024_PW_CDS SS Briefings
>
Meetings
>
2024
>
07. July
>
2024-07-22 1:30 PM - Public Works & CDS Study Session
>
7-22-2024_PW_CDS SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 11:25:31 AM
Creation date
7/18/2024 11:11:48 AM
Metadata
Fields
Template:
Meeting
Date
7/22/2024
Meeting title
Public Works & CDS Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 4: ALTERNATIVES EVALUATION CRITERIA <br /> Table 4-3 presents a summary of weighted explanations for the scoring, are included in <br /> scores for each alternative by Project Goal, Appendix F. A comprehensive environmental <br /> and the diagram in Figure 4-1 illustrates how evaluation was also performed, and findings <br /> the alternatives compared to each other. are presented in Appendix G. <br /> Detailed evaluation worksheets, along with <br /> Table 4-3 Tier 1 Evaluation - Weighted Scores <br /> Alt 1 Alt 2 Alt 3 Alt 4A Alt 4B Alt 5 Alt 6 <br /> 1-90 Outside 1-90 Median 1-90 North RouteNorth Route South No <br /> Widening Widening Reversible SR 903 Bullfrog Road Route Build <br /> Lanes Extension <br /> Safety 15.0 15.0 18.0 15.0 15.0 12.0 0.0 <br /> ..................................................................................................................................................................... <br /> Transportation <br /> 8.6 8.6 8.6 4.3 4.3 2.9 0.0 <br /> Demand <br /> ..................................................................................................................................................................... <br /> Freight Mobility 6.7 6.7 6.7 1.7 1.7 5.0 0.0 <br /> ..................................................................................................................................................................... <br /> Environmental 6.0 9.0 9.0 1.5 1.5 0.0 1.5 <br /> ..................................................................................................................................................................... <br /> Resiliency 9.4 9.4 9.4 1.9 1.9 1.9 0.0 <br /> ..................................................................................................................................................................... <br /> Equity/Inclusion 6.7 8.3 8.3 5.0 6.7 5.0 6.7 <br /> ...................................................................................................................................................................................................................................................- <br /> Relative Cost of <br /> 3.3 3.3 3.3 0.0 0.0 1.7 6.7 <br /> Alternatives <br /> Total Score 55.6 60.3 63.3 29.3 31.0 28.4 14.8 <br /> VOLUME 1: FEASIBILITY REPORT 1-90 Corridor Easton to Cle Elum Feasibility Study 1 61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.