My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7-22-2024_PW_CDS SS Briefings
>
Meetings
>
2024
>
07. July
>
2024-07-22 1:30 PM - Public Works & CDS Study Session
>
7-22-2024_PW_CDS SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 11:25:31 AM
Creation date
7/18/2024 11:11:48 AM
Metadata
Fields
Template:
Meeting
Date
7/22/2024
Meeting title
Public Works & CDS Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER S: COMMUNITYANDSTAKEHOLDER INVOLVEMENT <br /> Table 5-3 Public Survey 2, February 2024—Survey Results <br /> Alternative #Votes Reasons <br /> Alternative 1: 25 • Prioritize options that keep traffic on the freeway (1-90) <br /> Widen 1-90 to . Reasons include reducing congestion and improving emergency <br /> the Outside response times <br /> Avoid diverting traffic onto county roads to minimize hazards for <br /> residents <br /> • Emphasize safety, environmental impact, and long-term solutions <br /> • Preserve neighborhood integrity and minimize disruption to <br /> residents <br /> • Considerations include minimizing costs, preserving private <br /> property, and reducing environmental impact <br /> ................................................................................................................................................................... <br /> Alternative 2: 46 • Advocacy for economical options to minimize congestion and <br /> Widen 1-90 in hazards <br /> the Median • Prioritize keeping traffic on 1-90 to aid emergency response and <br /> safety <br /> • Utilization of existing freeway right of way for cost-effectiveness <br /> • Support for widening 1-90 to improve traffic flow and safety <br /> • Preference for options minimizing impact on local roads and <br /> residents <br /> • Consideration of snow removal efficiency and access management <br /> • Proposal for inward expansion to minimize environmental impact <br /> • Emphasis on maintaining safety, environmental impact, and <br /> property rights <br /> • Support for expanding 1-90 lanes to accommodate traffic and <br /> improve safety <br /> • Recognition of cost-effectiveness and reduced habitat <br /> destruction <br /> • Proposal for cost-saving measures such as utilizing existing <br /> median space <br /> • Advocacy for additional lanes on 1-90 in both directions for <br /> efficiency <br /> Im <br /> VOLUME I: FEASIBILITY REPORT 1-90 Corridor- Easton to Cle Elum Feasibility Study 1 77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.