Laserfiche WebLink
Ryegrass Material Haul <br />Contractor <br />Load Price <br />Subtotal (400 loads) <br />Tax (8.1%) <br />Total <br />Morgan and Sons Earthmoving <br />$ 333.00 <br />$ 133,200.00 <br />$ 10,789.20 <br />$ 143,989.20 <br />Reecer Creek Excavating <br />$ 400.00 <br />$ 160,000.00 <br />$ 12,960.00 <br />$ 172,960.00 <br />Belsaas and Smith <br />$ 556.75 <br />$ 222,700.00 <br />$ 18,038.70 <br />1 $ 240,738.70 <br />