Laserfiche WebLink
5129124,2:24PM newspaper-text (22)'html <br />. Initial Site Visit - Participate in an initial site visit to meet with the design team, gain familiarity with the site, and <br />dedicate a portion of the visit to discuss the previously completed concept and next steps to achieve project objectives <br />with the design team. <br />. Data Collection Site Visits - Visit the site to collect additional pertinent topographic, bathymetric, geomorphic, and <br />physical data beyond the existing dataset that may be required to validate the design and hydraulic modeling. Control <br />point data collected by the County will be available if the Contractor needs to utilize GPS for data collection. <br />. Draft 30% Design Review - Participate in a site visit at the draft 30% design milestone to review design elements, as <br />well as meet with the Technical Advisory Group to convey the current state of the design, discuss proposed project <br />elements, and solicit feedback. <br />. Draft 80% Design Review - Participate in a site visit at the draft 80% design milestone to review design elements, as <br />well as meet with the Technical Advisory Group to convey the current state of the design, discuss proposed project <br />elements, and solicit feedback. <br />Conceptual Design Review und Geomorphic Analysis <br />. Review the existing conceptual design and supporting data. <br />. Conduct Geomorphic Analysis to vet and inform the design approach <br />. Identifu additional data collection needs. <br />Draft (30%) Design Development <br />. Integrate conceptual design review comments <br />. Finalize design criteria <br />. Hydraulic modeling and analysis <br />. Basis of Design Report <br />. Draft 30% design drawings for review <br />. Draft design cost construction estimates based on quantities derived from the design process. <br />Druft (80%o) Design Development <br />. Integrate comments received during the Draft 30% design review and mid-design check-in with the Technical <br />Advisory Group. <br />. Refine hydraulic modeling and analysis. <br />. Basis of Design Report <br />. Draft 80% design drawings for review <br />. Meet the qualifications for construction permit applications with local, state, and federal agencies. <br />. Design level cost estimate based on latest design updates. <br />Final Plan (100%), Speci/icutions, und Estimate <br />Final design incorporates technical comments from stakeholders, funders, and permitters into a stand-alone and <br />comprehensive set of final drawings, a Basis of Design repott, and technical specifications for project construction. The final <br />design process must address and resolve all substantial issues raised in the permitting and stakeholder review process so that <br />all stakeholders agree on the final plans and result in 100% consttuction ready documents. <br />. Final Basis of Design Report <br />. Final plans <br />. Final special provisions <br />. Final quantities and engineer's estimate <br />E nvironmental Permitting <br />. Conduct necessary surveys, coordinate with regulatory agencies, prepare permit applications, and inform the project <br />team about potential streamline or programmatic restoration approaches to address local, state, and federal <br />environmental and cultural permitting needs. <br />A review team will evaluate each submittal based on the scoring criteria provided below: <br />Qualifications and Relevant Experience (30 points): Discuss the overall experience of your firm working on this type of <br />project and provide comparable examples. Provide the name and phone number for at least three (3) references of past <br />file:///C:/Users/candie.leader/Downloads/newspaper-text (22).html 215