KNIT <br />SCOPING DOCUMENTATION <br />Project Notes: The county plans on relocating to a new facility in approximately 10 years. New repairs <br />or products are to meet durability requirements needed to maintain the facility in good condition for <br />this duration at a minimum. <br />Construction Documents <br />The development of construction documents is based on the 90%pre-design package <br />developed under Task 1-Jail TI-Pre-Design. <br />JAIL <br />Exterior finish / coating repairs <br />A. Existing sanded exterior paint coating on existing concrete surfaces is failing. <br />The coating should be removed and refinished, after concrete panel cracking <br />repairs. New finishes may include new painted surfaces with high quality <br />concrete sealing products, EIFS or other panel system. <br />B. The existing exterior concrete panels are cracking in several locations and are <br />not limited to one area of the facility. Cracking occurs in spiderweb fashion <br />and horizontally at floor levels. In some instances, cracking can be seen on <br />both the exterior and interior surfaces. A structural evaluation will need to <br />occur to determine causes and repair solutions. <br />C. Remove existing vertical and horizontal expansion joints, including backer <br />rods. Replace joints with new backer rods and durable sealants. <br />D. Clean top of concrete wall caps at roof parapets. Install new treated wood <br />blocking and provide new sheet metal coping caps. <br />2. Interior repairs <br />A. The existing interior concrete panels are cracking in several locations and are <br />not limited to one area of the facility. Cracking occurs in spiderweb fashion <br />and horizontally at floor levels. In some instances, cracking can be seen on <br />both the exterior and interior surfaces. A structural evaluation will need to <br />occur to determine causes and repair solutions. <br />B. Remove existing vertical and horizontal expansion joints, including backer <br />rods. Replace joints with new backer rods and durable sealants. <br />3. Jail Public Entry Doors <br />A. The existing hollow metal double doors and side-lites are failing. Remove and <br />replace with identical secure system with ADA controllers. It's possible that <br />the sidewalls can be infilled with a wall system and replace the double doors <br />with a single 4'-0" wide secure hollow metal door and frame and ADA <br />controllers. <br />B. Remove interior vestibule doors and side-lites. Patch and repair walls and <br />ceilings. <br />C. Remove exterior steel railings and provide 1 to 3 concrete filled steel pipe <br />bollards in front of the jail entry doors to prohibit vehicle ramming of the <br />building. <br />4. Fire Sprinklers -Bid Alternate <br />A. Remove existing fire sprinkler system and replace. <br />B. Repair dry system as needed. <br />