Laserfiche WebLink
Estimate of Hours <br />Ellensburg Rodeo Arena Improvements - Phase 1 ATTACHMENT A ALSC Architects, P.S. <br />Preliminary Effort Analysis <br />312212024 <br />PRIN. <br />SEN ARCH <br />P.A. <br />INTERIORS <br />DRAFT <br />SEC. <br />TOTAL HRS <br />ALSC Summary of Tasks: Phase 1 <br />1 Project Restart <br />a Review previous archived work <br />0.5 <br />2 <br />2.5 <br />t Update files to current software requirements <br />4 <br />4 <br />c Research Building Code update implications <br />0.5 <br />4 <br />4.5 <br />c Initial Kick-off Meeting #1 with Key Stakeholders <br />8 <br />81 <br />1 <br />0.51 <br />16.5 <br />2 Scope Study <br />a Cost Study to identify revised Scope of Work within new budget <br />1 <br />4 <br />2 <br />2 <br />9 <br />b Design: Site[Building plan initial revisions <br />1 <br />6 <br />16 <br />23 <br />c Meeting #2: Review scope, site, building plans <br />8 <br />8 <br />0.5 <br />16.5 <br />d Finalize conceptplans; revise 3-D illustrations as needed for new scope <br />1 <br />1 <br />2 <br />4 <br />8 <br />e Meeting #3:Present to Rodeo Board <br />8 <br />8 <br />16 <br />f Finalize with any needed changes: plans, images, budget <br />0.5 <br />4 <br />4 <br />1 <br />9.5 <br />3 Design Development 60% <br />a Develop revised scope dravdn s in Revit <br />1 <br />4 <br />2 <br />24 <br />31 <br />b Meeting #4: Progress presentation on DD set <br />8 <br />8 <br />0.5 <br />16.5 <br />c Develop 50% drawing set,narratives <br />4 <br />16 <br />4 <br />12 <br />40 <br />4 <br />80 <br />d Update 3-13 illustrations <br />1 <br />24 <br />4 <br />29 <br />e Meeting #5: Review 50% DD final drafts Virtual <br />2 <br />2 <br />0.5 <br />4.5 <br />f Make needed revisions <br />1 <br />1 <br />4 <br />6 <br />g Meeting #6:Present to Rodeo Board <br />2 <br />2 <br />4 <br />h Finalize with any needed changes: plans, images, budget <br />1 <br />1 <br />4 <br />1 <br />7 <br />i Project Mana emenUConsultant Coordination <br />30 <br />30 <br />0 <br />'Meetings in bold are in -person; others are virtual <br />TOTAL HOURS <br />48.5 <br />127 <br />20 <br />18 <br />96 <br />8 <br />317.5 <br />HOURLY RATES <br />$235 <br />$170 <br />$130 <br />$105 <br />$90 <br />$70 <br />SUB TOTAL <br />$11,398 <br />$21,590 <br />$2,600 <br />$1,890 <br />$8,640 <br />$560 <br />TOTAL ALSC FEE <br />$46,678 <br />Consultants (Allowances) <br />10% mu <br />Cost Estimating - MACC Estimating <br />$8,000 <br />$800 <br />$8,800 <br />SWctural Engineering - DCI <br />$9,000 <br />$900 <br />$9,900 <br />Civil Engineering - DCI <br />$9.000 <br />$900 <br />$9,900 <br />Mechanical Engineering -MW <br />$9,820 <br />$982 <br />$10,802 <br />Electrical Engineering - MW <br />$6,820 <br />$682 <br />$7.502 <br />TOTAL CONSULTANT COST (w/o reimbursables) <br />$46,904 <br />TOTAL LUMP SUM FEE <br />$93,682 <br />Reimbursable Costs Allowances; billed at actual plus 10% mark-up) <br />person/trips <br />$ per trip <br />Travel 346 mile round trip, $.67 permile <br />5 <br />$ 231.82 <br />$1,159 <br />Per Diem <br />15 <br />$ 25.00 <br />$375 <br />Printing, Postage(Bidding Document Printing by Owner <br />$250 <br />Consultant Allowance <br />$1,500 <br />TOTAL REIMBURSABLES <br />$3,284 <br />TOTAL INCLUDING REIMBURSABLES <br />$96,866 <br />ALSC Architects 3/22/2024 <br />