My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-04-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2024
>
05. May
>
2024-05-07 10:00 AM - Commissioners' Agenda
>
2024-04-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 12:20:41 PM
Creation date
5/2/2024 12:14:41 PM
Metadata
Fields
Template:
Meeting
Date
5/7/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
117448
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�CSC, <br />ARCHITECTS <br />the Design Development phase to 100% and include all subsequent phases <br />through construction closeout. <br />The attached Effort Analysis (Attachment A) and Preliminary Project Schedule <br />(Attachment B) identify the basic tasks, meeting frequency and deliverables we <br />anticipate for accomplishing this work. At the conclusion of this initial phase, <br />Kittitas County representatives will have the option to have our A/E team <br />continue with the remaining work or to hold until a future date as needed. <br />The Phase 1 deliverables will include the following: <br />A. Re -starting the project: <br />1. Updating existing files to current software <br />2. Re -visiting code compliance for previous work completed <br />3. Project Budget <br />4. Appendix: Room Data Sheets, Interview Notes <br />B. Scoping the project to fit your new budget: <br />1. Site Planning <br />2. Floor planning <br />3. Cost Estimate Update <br />4. Re -work of 3-D imagery as needed <br />A detailed task list in included in Attachment A. <br />Project Team <br />ALSC Architects will lead this Phase 1 work, assisted by the following <br />consultants: <br />1. MACC Estimating - Consulting on cost budgeting. <br />2. DCI Engineers — Civil and Structural engineering <br />3. MW Engineering — Mechanical, Electrical and Plumbing engineering <br />Project Schedule <br />2024-004 — Ellensburg Rodeo Arena Improvements Study — 2024-0322 <br />
The URL can be used to link to this page
Your browser does not support the video tag.