Laserfiche WebLink
Amok <br />State <br />Washington <br />�� Department of Transportation <br />Aviation Dlaisbn <br />Airport Aid Application <br />Project Data Sheet <br />A Steward br Washington's Arlation System' <br />Complete a separate Project Data Sheet for each project listed from the Airport Aid Application (Form 900-030EF) <br />Kittitas County, Washington - - Project No. 1 - East Taxilane Pavement Rehab and Apron Reconfig. Const. <br />Project Category (Select One Only): <br />Pavement ()Safety ®Planning ()Security ()Runway Safety ®Equipment oMaintenance ()Property ®Other <br />❑ Rehabilitation ❑ Runway <br />Maintenance ❑Taxiway <br />❑ Reconstruction ❑ Apron <br />❑ New Construction ❑ Taxilane <br />❑ Helipad <br />❑ Other <br />2 Detailed Project Description / Approach to Accomplishing Project: <br />The project will involve pavement rehabilitation of the east portion of Parallel Taxiway B, East General <br />Aviation Apron, and the East Taxilanes. Pavement maintenance will consist of crack sealing for asphalt and <br />concrete pavements, application of seal coat, and two applications of pavement markings. Also, the <br />reconfiguration of the East General Aviation Apron will be included in this project. <br />3 Project Justification: <br />Extend the service life of the taxilane and apron. Improve movement ability in and through the area by <br />enhancing pavement markings and adjusting tie -down locations. <br />4 Cost Estimate Details: Source of Project Cost Estimate - Engineer's Estimate <br />Construction: $351,414.94 <br />Construction Administration: $99,960.00 <br />5 Project Schedule: <br />Expected Start of Project: 6/1/2024 Expected Completion of Project: 8/31/2024 <br />Start of Work Covered by Grant: 6/1/2024 Completion of Work Covered by Grant: 12/31/2024 <br />Submit a detailed proiect schedule (to include project milestones). Submitting project schedule via: Entailing - Electronic Document <br />6 Other Supporting project documentation (Required): <br />Submit a spending plan identifying anticipated grant expenditures by month. Submitting via: Emailing - Electronic Document <br />Submit job creation data using the Aviation Economic Impact Calculator. Submitting via: Emailing - Electronic Document <br />7 Other Supporting project documentation (As Applicable): <br />Submit documentation supporting your consultant selection process. Submitting via: Emailing - Electronic Document <br />Submit a copy of your consultant's Scope of Work. Submitting via: Emailing - Electronic Document <br />Have project plans and specifications been prepared? ❑Yes []No <br />Has a property appraisal been completed for property acquisition? []Yes ❑No <br />FAA AIP Project Number:3-53-0026-023-2024 <br />FAA Grant Contract Number: <br />Other supporting documentation? <br />SCIP Priority Score <br />DOT Form 900-030A EF <br />(WSDOT Use Only) <br />Revised 5/2023 <br />