My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_WSDOT Aviation Grant_East Taxilane
>
Meetings
>
2024
>
04. April
>
2024-04-16 10:00 AM - Commissioners' Agenda
>
Resolution_WSDOT Aviation Grant_East Taxilane
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2024 1:11:33 PM
Creation date
4/11/2024 1:08:45 PM
Metadata
Fields
Template:
Meeting
Date
4/16/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Authorize a Submittal of Airport Aid Application to the Washington State Department of Transportation Aviation Division for Bowers Field Improvement Project
Order
11
Placement
Consent Agenda
Row ID
116716
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Other Questions and Required Documentation <br />Master Plan / ALP Narrative Report - Please indicate if the airport has an approved Airport Master <br />Plan or Airport Layout Plan (ALP) Narrative Report by checking 'Yes' or'No'. If 'Yes' insert the month <br />and year the report is dated. <br />Airport Layout Plan (ALP) - Please indicate if the airport has an approved Airport Layout Plan (ALP) by <br />checking 'Yes' or'No'. If 'Yes' insert the month and year the plan was approved. The project you are <br />requesting funding for must be shown on the ALP in order to be considered for funding. If the airport <br />does not have an approved ALP, the only project the sponsor should request funding for is the <br />preparation of an Airport Master Plan and ALP. <br />Airport Information System (AIS) - Please indicate by checking 'Yes' or'No' if the airport sponsor met <br />the requirement to review and update their data in the AIS for the preceding calendar year by the <br />December 31 deadline. <br />Greenhouse Gas Policy - RCW 70A.45, outlines fund distribution prerequisites for infrastructure and <br />capital development projects, all airport sponsors should adopt a greenhouse gas emission reduction <br />policy in accordance with this law. Please indicate by checking 'Yes' or'No' if the airport sponsor has an <br />adopted policy. If 'Yes'submit a copy of the policy to WSDOT Aviation and indicate how you are <br />submitting by selecting the appropriate response from the drop -down menu. <br />For more information on this law, please visit Washington State Legislature's Revised Code of <br />Washington (RCW) at https://apps.leg.wa.gov/rcw/default.aspx?cite=70A.45. <br />While having a policy is currently not a requirement that determines grant eligibility, it is anticipated in <br />the near future that this will be an added requirement. <br />Airport Aid Grant Assurances - The airport's signed acceptance of WSDOT Aviation's Airport Aid <br />Program Grant Assurances (Chapter 468-260 WAC) must be submitted with each Airport Aid <br />Application. Please indicate how you are submitting the signed grant assurances by selecting the <br />appropriate response from the drop -down menu. Please include the the grant assurances document in <br />its entirety. <br />Adopted Resolution - Publicly owned airport sponsors must submit a resolution adopted by its elected <br />officials. The resolution shall 1) Authorize submittal of the application to WSDOT Aviation, 2) State that <br />the sponsor has the required matching funds available, and 3) State the elected officials support of the <br />application. Please indicate how you are submitting the signed grant assurances by selecting the <br />appropriate response from the drop -down menu. <br />6. Signing and submitting the Grant Application <br />WSDOT Aviation requests that airport sponsors submit the grant application and all supporting <br />documentation electronically. The Airport Aid Application, Project Data Sheet(s), and Supplemental <br />Justification Sheet(s) will need to be emailed from the Applicant's Authorized Representative as the <br />saved fillable form .pdf file (do not edit or alter the form in any way). The email being sent directly <br />from the Applicant's Authorized Representative will serve in lieu of an actual signature on a printed <br />document. <br />All application forms and supporting documentation must be received by WSDOT Aviation by the <br />published deadline. WSDOT will reply to the email acknowledging receipt of the application. <br />DOT Form 900-030EF - Instructions Page 2 of 2 <br />Revised 5/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.