Laserfiche WebLink
wooden bridge requires replacing. KRD does not hold a license for use of the bridge, and <br />no one has a deed from the Bureau of Reclamation for the bridge. Solving the issue, PW <br />proposes to deploy one of our temporary bridges for use during bridge replacement <br />construction. This solves access issues for Ranch Properties this season and allow the <br />bridge to be replaced fall of 2024. <br />Temporary bridge abutments require engineering and construction. Cost share between <br />Ranch Properties and the local land use developer seems reasonable by lessening the cost <br />burden on Road Fund rate payers. Given the Board has decided on the public benefit of <br />the new development, PW may also be a party to the cost share of the temporary bridge <br />replacement. <br />FISCAL IMPACTS: <br />Typically, temporary abutment design and construction is in the $100,000 range. <br />ATTACHMENTS: <br />None. <br />Page 2 of 2 <br />Public Works "Work Session Staff Report", 2024 <br />