My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DLR Group PSA 2021
>
Meetings
>
2021
>
12. December
>
2021-12-07 10:00 AM - Commissioners' Agenda
>
DLR Group PSA 2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 1:17:31 PM
Creation date
2/15/2024 1:17:25 PM
Metadata
Fields
Template:
Meeting
Date
12/7/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Change Order for DLR Group Contract
Order
7
Placement
Consent Agenda
Row ID
83921
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Patti Stacey <br />.. :. ...:r:' , , .Octobeijt;2fi2l <br />Page2 <br />ln the options descrlbed, here arethe constdeftrEons that would be addressed:1. Baselhe model: Valldadon of the space neede llst already prepared. <br />2. BaEellne moda[ Stackhg and blocking of the program from the eri$tlng spaoe needs"3. Basellne modeL Conceptual plannlng of tha bulldlng form and ratlos of sctaior mserials.4. Advansed modah Detalled floor plan wtth Uplcal wall composhlons and narnatve of qual$ of materials <br />throughout the bullding.5. Aduanced modeh Erterior material ard contextual lnformatlon forthe buil&U h the &wntown core <br />(materials selediong hlilding envelope deslg4 windows, acoess entrances. eia)6. Advanced model: Overall brSlding sylstems (mechanical, electrical, audio visual, etc) in a nanat'rte form <br />forthe cost estmator. <br />7. Advanced mdeh Civil baseline infonnation and basic site plan for access pofo*s laldecaping,grading, <br />etc. <br />a. We did propoce a clvil engheer from Kennewlck ln our prwlous propmls * a referencs.8. Advancad mo&k Aseessrnefit of sustainability requirements that may be lrsporated to meet state <br />energy code and sustainabifity measures adopted by Kittitas County. <br />I have attached two im4es lhat wo.dd be similar to the basellne moilel and the adnarced modd for yar <br />reference. <br />To completethe baseline modelwfiidrwouH indude the space needs programfiftgtb*fc$teanalysff, nanatlve <br />description for the estimdor, ild full co€{ estlmde, we propose a fee of $125,0{t0.@. <br />To provlde the advaned nt*|, ly€ r.$ouH propose uslng the WA State Fee Sc*redule fq ard*tectrnal servlces for <br />completlon of approximately 48& sc*renratic design and programmlng servhe. THe pmpqs€d iee urudd be <br />$325,000.00. <br />I appreclate the importance of ftls noftstrdytosrsurethe bond msasure anUcipated in fr122 b mrnde and <br />clearly dellneates the intent and mnnrdtnent of Kittitas Courly to the constttueilts fiat ilf,td rrulB on thls . <br />msasure. I am happytotalktffoughfte propoealwith you ln more detall. Thankyorrloryouroontlund <br />partner€hlp wlth DLR Group. <br />$lncerely, <br />DLR Group <br />Erlca Loynd <br />Prlnclpal <br />EL:el <br />Encl: RenderlngExamples
The URL can be used to link to this page
Your browser does not support the video tag.