Laserfiche WebLink
Professional Services Agreement (rev. 09/24/2018) <br />Page 15 of 19 <br /> <br /> <br /> <br /> <br /> <br /> <br />Invoiced on submittal of draft technical report. <br />Invoiced on submittal of draft technical report. <br />Payment Type <br />Lump Sum <br />Lump Sum <br />Lump Sum <br />Lump Sum <br />Estimate <br />$6,200 <br />$13,250 <br />$3,600 <br />$7,500 <br />$30,550 <br /> <br /> <br /> <br /> <br /> <br /> <br />EXHIBIT "B" <br />COMPENSATION <br />As full compensation for satisfactory performance of the work, the County shall <br />collect from Contractor compensation per the fee schedule: <br />$.14 per pound. Scrap Batteries shall consist of Lead Acid Batteries only, <br />including but not limited to Vehicle, ATV, Motorcycle, and UPS batteries. <br />Contractor shall submit to the County an invoice which details services provided to <br />Kittitas County Solid Waste, including tonnage received and recycled/disposed by <br />the Contractor. <br />Invoices shall be sent to the County; <br />Kittitas County Solid Waste <br />925 Industrial Way <br />Ellensburg, WA 98926 <br />(509)962-7542 <br />County shall collect for Contractor services within thirty (30) days from receipt of <br />Contractors invoice.