Laserfiche WebLink
Page 3 of 6 Appendix 28.93 <br />1. Annual Construction Program <br />2. Six -year Transportation Improvement Plan <br />3. Americans with Disabilities Act Transition plan amendments <br />6. Right-of-way actions — Describe activities during this reporting period associated with the purchase, <br />sale, lease/use, or transfer of real property (related to highway transportation/public right-of-way <br />use). Include demographic information of affected populations. For example, the race, color, national <br />origin of affected property/business owners(s)/tenant(s). <br />Purchase of right-of-way for realignment of Berry Road. Single residential parcel owner of vacant land. <br />7. Identify right-of-way appraisers and acquisition staff (used during this reporting period) by race, color, <br />national origin. <br />Justin Turnbull, Right of Way Professional, White, Canada birthplace <br />8. Studies and Plans — Were any transportation studies (including environmental reviews) conducted or <br />transportation plans completed during this reporting period? Identify the data source(s) and provide <br />data summary (Title VI/Environmental Justice Analysis) relative to ethnicity, race, languages spoken, <br />neighborhoods, income levels, physical environments, and/or travel habits. Explain how data was <br />used in these studies/reviews/plans. <br />The Average Daily Traffic (ADT) counts, and pavement ratings are conducted every year for all county <br />roads. Each county road is rated every other year. These counts and ratings are used to prioritize <br />future transportation improvements. All county roads are included in this analysis, considering all <br />populations groups -including minority, women, low-income, and limited English proficiency <br />population groups equally. Title VI provisions will be met through any contracts associated with this <br />activity. <br />9. Project Location and Design — Provide a list of construction projects that began during this reporting <br />period. Using a map of the LPAs service area, identify project locations, and a brief description of the <br />projects' benefits/burdens to affected populations. If possible, provide a map that overlays projects <br />with the racial composition of affected neighborhoods. <br />Projects began during this reporting period include: <br />1. Manastash Rd Creek Bank Stabilization <br />2. Intersection & Corridor Improvements <br />3. Cooke Canyon Rd Bridge Replacement <br />4. Faust Rd Bridge Replacement <br />5. Vantage Highway over Cascade Canal Culvert Replacement <br />6. Airport Sidewalk Maintenance <br />7. Vantage Hwy Paving (Construction did not occur) <br />Project burdens were temporary such as traffic delays and noise from construction equipment. Road <br />alignments remained as existing. Benefits identified include improved reliability of the rod and <br />