Laserfiche WebLink
KITTITAS COUNTY <br /> DEPARTMENT OF PUBLIC WORKS <br /> PUBLIC WORKS—BOARD OF COUNTY COMMISSIONERS <br /> 2024 STUDY SESSION STAFF REPORT <br /> STUDY SESSION DATE: January 8, 2024 <br /> TOPIC: Dunford Barn <br /> ACTION REQUESTED: Direct Staff <br /> LEAD STAFF: <br /> Mark R. Cook <br /> RECOMMENDATION: <br /> Direct staff prepare enabling documents. <br /> BRIEFING SUMMARY: <br /> • The Board of County Commissioners agreed to have staff work with the Dunford <br /> Barn owner to prepare ownership transfer documents. <br /> • The owner's representative has delivered a draft deed that requires the county to 4 <br /> construct access improvements. <br /> • The Engineering Division of Public Works has prepared preliminary improvement <br /> plans supporting the new access to the barn. <br /> BACKGROUND: <br /> Previously, discussions around ownership transfer have not included the mandatory <br /> requirement that the County construct access improvements. The proposed deed requires the <br /> county to construct access improvements to the Dunford Barn. The improvements are <br /> scheduled for construction in 2026 and appear in the recently adopted Kittitas County Capital <br /> Improvement Plan (CIP)—"Six-year parks and tourism capital plan" (EXHIBIT 1). <br /> DISCUSSION: <br /> The deed reservation does not have a timeline associated with it. Public Works designed the <br /> access to benefit the plat as a secondary access (EXHIBIT 2). Our thinking is that we would <br /> complement the developer's timeline constructing the access ahead of the full roadway and <br /> parking lot. This could be done with county forces in 2024. <br /> There is no problem with the deed as restricted so long as the county follows through with <br /> the full tourism improvements as designed and programmed in the CIP. <br /> FISCAL IMPACTS: <br /> $660,000 in design,permitting and construction is programmed in the 2024—2029 Six-year <br /> CIP—Recreation/Tourism. The final design is slated for 2024,permitting in 2025 with <br /> construction in 2026. <br /> ATTACHMENTS: <br /> EXHIBIT 1: RECREATION/TOURISM CIP (2024—2029) <br /> EXHIBIT 2: DEED <br /> Page 1 of 3 <br /> Public Works"Work Session Staff Report",2024 <br />