My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 Docket Enabling Ordinance
>
Meetings
>
2023
>
12. December
>
2023-12-19 10:00 AM - Commissioners' Agenda
>
2023 Docket Enabling Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2023 12:18:03 PM
Creation date
12/14/2023 12:16:18 PM
Metadata
Fields
Template:
Meeting
Date
12/19/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Ordinance for the 2023 Annual Docket Amendments to Kittitas County Code and Comprehensive Plan
Order
12
Placement
Consent Agenda
Row ID
112272
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2023 Docket Enabling Ordinance December 19, 2023 <br />Page 79 <br /> <br /> <br />7. Identification of proposed frontage improvements and relationship to planned <br />bicycle and pedestrian facilities. <br />8. Identification of roadway and intersection improvements planned to be <br />constructed by the County or other development. <br />9. Table of the future LOS under project conditions at the study intersections and <br />including all development access points. <br />I. Summary of Concurrency Evaluation <br />1. List of identified approved projects included in the analysis. <br />2. Map showing the existing volumes on the arterial network. <br />3. Map showing the net new daily volumes added by the project on the arterial <br />roadway network. <br />4. Map showing the total daily volume (existing + approved + project) for arterial <br />road segments. Daily volumes for pipeline projects shall be obtained from copies <br />of previous TIA reports available from the County. <br />5. Map or table showing the volume-to-capacity ratio and LOS for each arterial road <br />segments. The County will provide a map of roadway capacity which includes any <br />committed projects to be completed within the next six years. <br />List of any roadway segments or where the LOS exceeds the standard creating a <br />concurrency deficiency. <br />J. Summary of Project Conditions with Mitigation. <br />1. Identification of proposed frontage improvements, and proposed connections to <br />planned bicycle and pedestrian facilities. <br />2. Identification of proposed mitigation at site access points required to meet <br />County intersection LOS requirements during the PM (and other) peak hours. <br />3. Identification of mitigation at identified concurrency intersections required to <br />meet County roadway LOS requirements. <br />4. Identification of mitigation measures at study non-concurrency intersections <br />required to meet County LOS requirements during the PM (and other) peak <br />hours. <br />
The URL can be used to link to this page
Your browser does not support the video tag.