My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 Docket Enabling Ordinance
>
Meetings
>
2023
>
12. December
>
2023-12-19 10:00 AM - Commissioners' Agenda
>
2023 Docket Enabling Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2023 12:18:03 PM
Creation date
12/14/2023 12:16:18 PM
Metadata
Fields
Template:
Meeting
Date
12/19/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Ordinance for the 2023 Annual Docket Amendments to Kittitas County Code and Comprehensive Plan
Order
12
Placement
Consent Agenda
Row ID
112272
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2023 Docket Enabling Ordinance December 19, 2023 <br />Page 152 <br /> <br /> <br />Road construction performed by County forces or by contract for the County will be inspected <br />under supervision of the County Engineer. <br /> <br />12.05.01.050 Call Before You Dig. <br />Developers and contractors are responsible for notification of utilities a minimum of two <br />working days in advance of any excavation, or as required by RCW 19.122. The utility One-Call <br />Center phone number 1-800-424-5555 or 811 should be prominently displayed at the work site. <br />Notifications may also be entered online at www.callbeforeyoudig.org. <br /> <br />12.05.01.060 Penalties for Failure to Notify for Development Inspection. <br />Timely notification by the developer as noted is essential for the County to verify through <br />inspection that the work has been performed in accordance with approved plans and these <br />standards. Failure to request inspection within the notification times listed in KCC 12.05.02.070 <br />may result in special arrangements by the County for appropriate sampling and testing after- <br />the-fact, with certification, either by a qualified private engineer or by County personnel. Costs <br />of such testing and certification shall be the responsibility of the developer. If the County <br />Engineer requires further sampling, testing or certification, further work on the development <br />may be prohibited or limited per KCC 12.01.060 until all directed tests have been completed and <br />corrections made to the satisfaction of the County Engineer. <br /> <br />Article II. Construction Requirements and Inspection <br /> <br />12.05.02.010 Purpose. <br />See KCC 12.05.01.010 and KCC 12.01.010 <br /> <br />12.05.02.020 Applicability. <br />See KCC 12.05.01.020 and KCC 12.01.020 <br /> <br />12.05.02.030 Basis for Control of Work <br />The basis for control of work shall be as follows: <br />A. Work performed for the construction or improvement of public or private roads in <br />association with land development shall be completed in accordance with the <br />approved plans, and these standards. No work shall be started until such plans are <br />approved by the County Engineer. Any revision to plans shall be approved by the <br />County Engineer before being implemented. Failure to receive the county’s approval
The URL can be used to link to this page
Your browser does not support the video tag.