My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 Docket Enabling Ordinance
>
Meetings
>
2023
>
12. December
>
2023-12-19 10:00 AM - Commissioners' Agenda
>
2023 Docket Enabling Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2023 12:18:03 PM
Creation date
12/14/2023 12:16:18 PM
Metadata
Fields
Template:
Meeting
Date
12/19/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Ordinance for the 2023 Annual Docket Amendments to Kittitas County Code and Comprehensive Plan
Order
12
Placement
Consent Agenda
Row ID
112272
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2023 Docket Enabling Ordinance December 19, 2023 <br />Page 134 <br /> <br /> <br />building permit, special use permit, and other approvals in the Kittitas County Code, <br />construction plans for these improvements shall be prepared that meet the requirements in <br />these standards. Failure to meet the requirements set out in this chapter shall constitute an <br />incomplete application and shall not be accepted for review. <br /> <br />12.04.10.030 General Standards for Final Construction Plans. <br />The following general standards shall be met for final construction plans: <br />A. All road and stormwater construction must conform to Kittitas County Road Standards <br />current at the time of application. Any construction occurring four years or more after <br />final approval shall require reexamination of the plans by the Engineer who may require <br />that they be made to conform to standards and specifications current at that time. <br />When a valid engineering plan development agreement is in place, those standards <br />apply. <br />B. Application for a grading plans and permit shall be required unless the applicant is <br />submitting construction drawings that are signed and sealed by an engineer licensed in <br />the State of Washington. Grading is covered in KCC 14.05. <br />C. Construction plans for roads accessing state highways shall be submitted by the <br />applicant’s engineer directly to WSDOT in accordance with WSDOT standards and <br />submittal procedures. The applicant shall obtain all approvals from WSDOT before final <br />plan approval will be granted by Kittitas County. A copy of the approved plan from <br />WSDOT shall be submitted before final plan approval. <br />D. Prior to release of collateral by Kittitas County, the applicant must present a statement <br />from a civil engineer licensed in the State of Washington that the project has been <br />completed in substantial compliance with approved plans and specifications. The <br />applicant’s engineer must document that regular on-site inspections were conducted <br />during the course of construction, and the field plans utilized were the same as those <br />approved by Kittitas County. The engineer shall also state their professional opinion <br />regarding testing and compliance with plans and specifications.. A final inspection by the <br />Department of Public Works is required and all deficiencies must be corrected prior to <br />release of collateral. <br />The applicant must also submit the following items prior to release of collateral or final approval:
The URL can be used to link to this page
Your browser does not support the video tag.