My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 Docket Enabling Ordinance
>
Meetings
>
2023
>
12. December
>
2023-12-19 10:00 AM - Commissioners' Agenda
>
2023 Docket Enabling Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2023 12:18:03 PM
Creation date
12/14/2023 12:16:18 PM
Metadata
Fields
Template:
Meeting
Date
12/19/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Ordinance for the 2023 Annual Docket Amendments to Kittitas County Code and Comprehensive Plan
Order
12
Placement
Consent Agenda
Row ID
112272
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2023 Docket Enabling Ordinance December 19, 2023 <br />Page 122 <br /> <br /> <br />D. Any appeals of a denied access permit shall be resolved through the Administrative <br />Decisions Appeals process according to KCC 15A.07. <br /> <br /> <br />12.04.07.080 Permit Conditions and Requirements. <br />A. The specific requirements for construction of the driveway approach and driveway will <br />be issued to the permittee along with the driveway approach permit. <br />B. The permittee will have 12 months from the date of issuance, as shown on the permit, to <br />complete construction of the driveway and request inspection by the Department, <br />unless a building permit is open, then expiration will run concurrent with building <br />permit expiration date. <br />C. An extension to the access permit will only be considered if construction of the <br />approach and driveway has been substantially completed and the extension request is <br />made prior to the permit expiration date. The permittee can request an extension to <br />the Department in writing. The Department will determine if the approach has been <br />substantially completed and determine the length of the extension, if granted. <br />D. The expected dates of construction and expected use of the driveway access shall be <br />included on driveway access permit application. The permittee shall notify the <br />Department at least 48 hours prior to any construction in County right-of-way. <br />E. The Department shall inspect the driveway access and the driveway upon completion of <br />construction to ensure that all terms and conditions of the permit are met. The <br />Department may request to inspect the driveway access during construction. <br />F. The construction of the driveway access and its appurtenances as required by the terms <br />and conditions of the permit shall be completed at the expense of the permittee. <br />G. It is the responsibility of the permittee to complete the construction of the driveway <br />access and the driveway according to the terms and conditions of the permit. The <br />Department may order a halt to any unauthorized construction or use. <br />H. Adequate construction signing, in conformance with MUTCD, most recent edition, is <br />required at all times during driveway access construction. This may include, but is not <br />limited to, the use of signs, flashers, barricades and flaggers. The Department and its <br />duly appointed agents and employees shall be held harmless against any action for
The URL can be used to link to this page
Your browser does not support the video tag.